Similar Projects
CBJTC Precinct Road North Culvert Replacement
Bidding
Less than $500,000 est. value
Starke, FL 32091

CBJTC North Tank Trail Emergency Repair
Bidding
Less than $350,000 est. value
Starke, FL

Cone Park Soccer Field Drainage Improvements
Post-Bid
Gainesville, FL 32641

Construction Manager at Risk Town-Wide Overhead Utility Undergrounding Phase 2 & 3 - South
Post-Bid
West Palm Beach, FL

County Road 880 Twenty Mile Bend Slope Protection
Results
$1,050,000 est. value
FL

Construction Engineering and Inspection Services for Old Plank Road Drainage Improvements
Results
Jacksonville, FL

CBJTC East Bay Road Washout Repair
Bidding
Less than $500,000 est. value
Starke, FL 32091

Natural Resource Conservation Service (NRCS) 101 Ranch Wetland and Reserve Easement Restoration, Okeechobee County, FL
Post-Bid
$500,000 to $1,000,000 est. value
Okeechobee, FL

Craig Park Seawall Restoration
Results
Less than $310,200 est. value
Tarpon Springs, FL 34688

CBJTC Gulfport Street Washout Repair
Bidding
Less than $420,000 est. value
Starke, FL 32091

Asphalt Paving, Resurfacing and Drainage
Term Contract
Post-Bid
FL

Bay Drive Park Sitework Construction
Results
Less than $1,486,427 est. value
FL

CBJTC Mosley Road Washout Repair
Bidding
Less than $500,000 est. value
Starke, FL 32091

Beach Erosion Control and Hurricane Protection Project, Surfside Segment, Dade County, Florida
Post-Bid
$15,000,000 to $25,000,000 est. value
Surfside, FL

Hurricane Irma - Hobie Island and Virginia Key Repairs and Restoration
Results
Less than $2,700,000 est. value
FL

Reported 02/09/2019 12:00 AM
Project Title

C-44 Intake Canal Bank Stabilization Martin County, Florida

Physical Address View project details and contacts
City, State (County) FL   (Martin County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $15,000,000 to $25,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Description of Project: The work consists of minor grading of the slopes of the C-44 Intake Canal starting from the north side of the Citrus Boulevard Bridge up to the crossing in the Intake Canal at approximately 4.4 miles north and placing geotextile fabric with a 12 to 18 inch thick layer of riprap on top. Since most of the proposed geotextile and riprap will be placed under water (18 inches thick up to elevation 13.0', NAVD) hydrographic and topographic surveys shall be secured by the contractor before, during and after construction. The bottom toe and the 1V:3H side slopes of the canal shall be graded for placement of the geotextile and riprap to the design top elevation of 15.3' NAVD. Most of the placement will be done in the wet and dewatering is not allowed. The material removed from the grading of the slopes shall be placed in the nearby designated disposal area. The performance period for the work is 24 months from the date of award. Specific Project Challenges: Dewatering is not allowed. Water levels in the C-44 Intake Canal are mainly affected by rainfall, evaporation, local runoff, and the operation of Lake Okeechobee which is managed by the Jacksonville District U.S. Army Corps of Engineers (Corps) in accordance with the 2008 Lake Okeechobee Regulation Schedule. The water levels in the C-44 Canal, which affect the water levels in the C-44 Intake Canal, is controlled by structures S-308 and S-80, which control the easterly discharge of Lake Okeechobee water to tidewater. In addition, S-80 provides means for passing boat traffic through the C-44 Canal. When S-308, is closed, S-80 will maintain an upstream elevation from 14.0 to 15.0 ft., NGVD29 in so far as is possible. Stone Requirement: Contractor will be required to furnish stones that are sound, durable and angular in shape. Stones shall have an elongation (ratio of greatest dimension to least dimension) less than 3:1 and no stone shall have and elongation greater than 4:1. Material shall be free from cracks, seams, non-mineralized or other defects that would tend to increase its deterioration from natural causes. Stones shall be graded in size to produce a dense interlocking mass. Riprap shall consist of dense, natural rock fragments. Stones shall be free from quarry fines, soil, shell material, organic material, and shale seams. Rounded boulders or cobbles shall not be used. Riprap shall conform to the following gradation: Type A (6-inch average size) - diameter 12-in 95-100 percentage passing, diameter 6-in 25-75 percentage passing, and diameter 3-in 0 to 10 percentage passing. Base Preparation - Areas on which geotextile and riprap are to be placed shall be graded to conform to cross sections shown on the contract drawings. Excavation and subgrade preparation shall be in accordance with contract earthwork requirements. Clear the subgrade of sticks, stones, debris and other materials that could puncture the overlying geotextile. The prepared base will be inspected by the Contracting officer prior to placement of geotextile. No geotextile shall be placed on the subgrade, above or below water, without prior acceptance of subgrade conditions by the Contracting Officer. Geotextile - Place Type 1 Geotextile in accordance with contract geotextile requirements. The geotextile must be in intimate contact with the subgrade. Geotextile shall be placed only on subgrade approved by the Government. Placement of Riprap - Place riprap in a manner which produces a well-graded mass of rock with the minimum practicable percentage of voids. Riprap shall only be placed by equipment or means that are identified in the Work Plan. No equipment shall be operated directly on the completed stone protection system. Riprap shall be placed to its full course thickness in one operation and in such manner as to avoid displacing or damaging the geotextile. The large stones shall be well distributed and the entire mass of stones in their final position shall be graded to conform to the gradation specified. Placement shall begin at the bottom of the area to be covered and continue up slope. Subsequent loads of material shall be placed against previously placed material in such a manner as to ensure a relatively homogenous mass. The finished riprap shall be free from objectionable pockets of small stones and clusters of larger stones. Placing riprap in layers will not be permitted. Placing riprap by dumping it into chutes, or by similar methods likely to cause segregation of the various sizes, shall not be permitted. Placing riprap by dumping it at the top of the slope and pushing it down the slope shall not be permitted. The desired distribution of the various sizes of stones throughout the mass shall be obtained by selective loading of the material at the quarry or other source; by controlled dumping of successive loads during final placing; or by other methods of placement which will produce the specified results. Each truckload shall meet the gradation requirements. Rearranging of individual stones shall be required to the extent necessary to obtain a well-graded distribution of stone sizes as specified above. However, manipulating stone by means of dozers or other blade equipment shall not be permitted. Riprap shall be placed in conjunction with the construction of the ground surface, canal slopes or other adjacent features, earthen features, and with only sufficient lag in construction of the stone protection as may be necessary to prevent mixing of subgrade and stone protection materials. Excavation and Placement - All excavation and placement of geotextile, riprap, fill, and sod in a given work section shall be completed prior to starting a new work section. Tolerance for riprap - A tolerance of plus 6 inches and minus 3 inches from the slope lines and grades shown on the contract drawings will be allowed in the finished surface of the riprap, except that the extreme of this tolerance shall not be continuous over an area greater than 200 square feet. The average tolerance of the entire job shall have no more than 50 percent of the tolerances specified above.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents