Similar Projects
Last Updated | 07/25/2023 03:49 PM |
Project Title | River Brook Drive Culvert Replacement |
Physical Address | View project details and contacts |
City, State (County) | Rochester, VT 05767 (Windsor County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected July 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $100,000 [brand] Estimate |
Plans Available from | Construction Manager |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of 7/24/2023 this project has been suspended until early 2024. The White River Partnership (WRP) has grant funds to construct a new town highway culvert to replace existing culvert on River Brook Drive in Rochester, VT. Work includes replacement of existing pipe arch with 17-0 x 10-10 x 58-6 long aluminum structural plate pipe arch embedded to incorporate a natural stream bottom. Reconstruction of stream channel, stream banks, and roadway approaches; installation of one-way temporary bypass road including temporary stream crossing structure; all associated erosion prevention and sediment control work and associated roadway reconstruction. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |