Similar Projects
Camden Baker Apartments
New Construction - 214,991 SF
Conception
Denver, CO 80223

East 16th Avenue and Logan Street Apartments
New Construction - 221,309 SF
Conception
$10,000,000 CJ est. value
Denver, CO 80203

Towneplace Suites and Fairfield Inn by Marriott / Denver
New Construction, Infrastructure
Design
$25,100,000 CJ est. value
Denver, CO 80204

Monaco & Evans Apartments / Parallel Apartments
New Construction - 328,340 SF
Design
Denver, CO 80224

Wilder Apartments f/k/a Colfax Apartments
New Construction - 249,109 SF
Post-Bid
$55,129,587 est. value
Denver, CO 80204

North East Regional Office Addition
Addition, Demolition, Infrastructure
Post-Bid
$1,500,000 CJ est. value
Denver, CO 80216

PKAA, Alpine Gulch Project
Results
$109,000 est. value
Denver, CO

PKAA, RAD Project
Results
$100,000 to $150,000 est. value
Denver, CO

Block 176
New Construction, Demolition - 767,123 SF
Construction
Denver, CO 80202

Block 176
New Construction, Demolition - 767,123 SF
Construction
Denver, CO 80202

Apartment Building
New Construction - 310,000 SF
Pending Verification
Denver, CO 80204

The Finch Apartments
New Construction, Renovation
Pending Verification
$15,500,000 est. value
Denver, CO 80202

Archdiocese of Denver Low-Income Senior Housing
New Construction
Conception
Denver, CO 80219

Hurley Place - Phase I
New Construction
Design
Denver, CO 80216

Clara Brown Commons
New Construction - 75,242 SF
Post-Bid
$15,000,000 est. value
Denver, CO 80205

Last Updated 10/24/2022 05:34 PM
Project Title

Shelter Facility Acquisition and Improvements - 2021 Bond - City of Denver

Physical Address View project details and contacts
City, State (County) Denver, CO 80202   (Denver County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $30,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The pandemic drew into focus gaps in Denver’s shelter system, specifically people with health concerns, couples and families, people who identify as transgender, and pet owners who experienced barriers in accessing traditional congregate shelter. This project will fund the acquisition, conversion, and construction of 300 rooms at locations throughout Denver, focusing on hotel/motels for non-congregate shelter and housing for those who need it. As of October 24, 2022, this project is included in the planning phase. A design firm has not been selected. A firm timeline for construction has not been established.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents