Similar Projects
Remove and Replace 6 Dryers
Post-Bid
Lisbon, OH 44432

Remove and Replace 5 Commercial Washers
Post-Bid
Lisbon, OH 44432

Walk Thru Metal Detectors (WTMD)
Results

Walk Thru Metal Detectors (WTMD)
Results

Skid Steer Loaders
Term Contract
Post-Bid

Down-Draft Paint Booth With Mixing Room
Post-Bid
Vienna, OH 44473

Institutional Kitchen Equipment
Alteration
Post-Bid

Graders
Alteration
Post-Bid

Double Barrel Roller
Term Contract
Post-Bid

Hydroseeders
Alteration
Post-Bid

CCTV and Photo Beam Installation
Alteration
Post-Bid
Cleveland, OH 44114

Purchase of a Skid Steer with Bucket
Alteration
Post-Bid
OH

Weight Room Flooring and Equipment
Alteration
Post-Bid
$200,000 est. value
Bucyrus, OH

Snowplows
Alteration
Post-Bid

Air Compressor Replacement
Alteration
Post-Bid
$140,000 est. value
Mineral Ridge, OH 44440

Last Updated 09/02/2022 09:36 AM
Project Title

Nimmer Apartments/2022 Front Door Renovations and Related Work

Physical Address View project details and contacts
City, State (County) Akron, OH 44310   (Summit County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $157,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

For Nimmer Apartments/2022 Front Door Renovations and Related Work All bids must be accompanied by a bid guarantee which shall be in the form of either: a) a bond secured by a surety company acceptable to the U. S. Government and authorized to do business in the State of Ohio. The amount of the bond shall be for the full (100%) amount of the bid, plus alternates; b) a certified check, cashiers check, bank draft or irrevocable letter of credit. The amount of the certified check, bank draft, irrevocable letter of credit shall be in the amount of ten percent (10%) of the amount of the bid, plus alternates. The Bid Guarantee shall insure the execution of the contract and the furnishing of a method of assurance of completion by the successful bidder. The assurance of completion shall be: (1 ) a performance and payment bond in the penal sum of 100 percent (100%) of the full amount of the contract; (2) a twenty percent (20%) cash deposit; or (3) a twenty five percent (25%) irrevocable letter of credit. NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT (Governors Order of January 27, 1972) Bidders' attention is called to the provision for "EQUAL EMPLOYMENT OPPORTUNITY CLAUSE" and the "STANDARD FEDERAL EQUAL EMPLOYMENT CONSTRUCTION CONTRACT SPECIFICATIONS". The goals, timetables, compliance and regulations set for in the Executive Order deemed part of this solicitation by reference. Each bidder must insure that all employees and applicants for employment are not discriminated against because of their race, color, religion, sex or national origin. Payment for labor as it applies to this work shall not be less than the amount established by the U.S. Department of Labor. Bidder's attention is further called to the provisions of Section 3 of the Housing and Urban Development Act of 1968, as amended (12 U.S.C. 1701 u) (Section 3), and are required to comply with all requirements as relates to Section 3, including training and employment opportunities for Section 3 Residents and Business Concerns for this Section 3 covered project. The Akron Metropolitan Housing Authority reserves the right to reject any or all bids, to re-advertise our bids, and to waive any informality in bids received whenever such rejections, re-advertisement or waiver is in the best interest of the Housing Authority. No bid shall be withdrawn for a period of (60) days subsequent to the opening of bids without the consent of the Akron Metropolitan Housing Authority. Persons with disabilities needing assistance are asked to contact AMHA's ADA Coordinator, 100 West Cedar Street, Akron, Ohio 44307, (330) 762-9631 or Ohio Relay at 800-750-0750 at least seven (7) days in advance.

Details

Division 11 - Equipment, Operation and Maintenance of Equipment, Vehicle Service Equipment, Maintenance Equipment, Unit Kitchens, Residential Equipment, Residential Appliances, Agricultural Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents