Similar Projects
Bridge Deck Overlay
Infrastructure
Conception
$1,741,840 est. value
Rising Sun, IN 47040

HMA Overlay, Preventive Maintenance
Infrastructure
Design
$3,380,000 est. value
Bloomfield, IN 47424

Independence Hill Conservancy District Sanitary Sewer Lateral Pipelining, Merrillville
Infrastructure
Design
$5,000,000 est. value
Merrillville, IN

Small Structure Replace, Bridge Rehab and Pavement Patching
Renovation, Infrastructure
Bidding
$1,739,258 est. value
Lizton, IN

2022-1 CCMG Community Crossings Paving Program
Infrastructure
Bidding
$2,000,000 est. value
Dillsboro, IN

Resurfacing County Roads
Post-Bid
Bedford, IN

2021 Street Improvements
Post-Bid
Orland, IN 46776

Alley Reconstruction
Results
Fort Wayne, IN 46802

Asphalt Resurface
Results
IN

HMA Overlay, Preventive Maintenance
Infrastructure
Design
$2,656,234 est. value
Kokomo, IN 46901

Various Street Improvements
Infrastructure
Bidding
$400,000 est. value
Monticello, IN

Asphalt Milling and Resurfacing on Various Streets
Post-Bid
Rockville, IN

Road Reconstruction
Results

2020 Community Crossings Road Improvements
Post-Bid
Argos, IN

Asphalt Resurface
Results
IN

Last Updated 06/24/2022 01:00 AM
Project Title

2022 CCMG Street and Stormwater Improvements

Physical Address View project details and contacts
City, State (County) Boonville, IN   (Warrick County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1 S. Third Street: From Moore Street south 3.268 L.F.. Approx. 3,268 L.F. of Milling and Resurfacing and Siormwatcr Infrastructure 2. W. Elm Street: From S. Cypress Street to S. First Avenue Approx. 702 L.F. of Milling and Resurfacing and Stormwater Infrastructure 3. N. Williams Street: From E. North Street to E. Short Street Approx. 608 L.F. of Milling and Resurfacing and Stormwater Infrastructure 4. E. Columbia Street: From S. Third Street to S. Fourth Street Approx. 329 L.F. of Milling and Resurfacing 5. N. Julian Court: From N. Eskew Road to Terminus Approx. 1,195 L.F. of Milling and Resurfacing 6. N. Eskcw Road: From SR 62 to SR 261 Approx. 1,775 L.F. of Milling and Rcsurfacint>> 7. N. Sixth Street: From E. Chestnut Street to E. Main Street Approx. 1,255 L.F. of Milling and Resurfacing and Stormwatcr Infrastructure 8. E. Water Street: From N. Eighth Street to Terminus Approx. 438 L.F. of Milling and Resurfacing 9. E. Cherry Street: From S. Forrest Avenue to S. Hudspeth Avenue Approx. 281 L.F. of Milling and Resurfacing 10. E. F.lm Street' From S. Fifth Street to Terminus Approx. 330 L.F. of Milling and Resurfacing and Stormwater Infrastructure 11. N. Fifth Street: From E. Chestnut Street to E. Poplar Street Approx. 506 L.F. of Milling and Resurfacing and Stormwatcr Infrastructure 12. E. Liberty Street: From N. 3ld Street to N. Fourth Street Approx. 438 L.F. of Milling and Resurfacing 13. E. Gum Street: From N. 6'1' Street to N. Seventh Street Approx. 446 L.F. of Milling and Resurfacing and Stormwater Infrastructure 14. N. Charlton Avenue: From E. Walnut Street north 1.232 L.F. Approx. 1,232 L.F. of Milling and Resurfacing 15. W. Walnut Street: From S. Second Street to S. Pine Street Approx. 1,860 L.F. of Milling and Resurfacing and Stormwatcr Infrastructure 16. S. Washington Street: From N. Yankcctown Road south 2,197 L.F. Approx. 2,197 L.F. of Milling and Resurfacing and Stormwater Infrastructure 17. E. Oakdale Terrace: From E. Main Street to Terminus Approx. 1,079 L.F. of Milling and Resurfacing 18. W. Maxvillc Road: From S. Eighth Street cast 700 L.F. Approx. 700 L.F. of Milling and Resurfacing 19. N. Ann Street: From E. Short Street to E. North Street Approx. 592 L.F. of Milling and Resurfacing 20. E. Short Street: From N. Stevens Street to N. Williams Street Approx. 445 L.F. of Milling and Resurfacing 21. E. Walnut Street: From SR 62 to N. Charlton Avenue Approx. 738 L.F. of Milling and Resurfacing and Stormwater Infrastructure 22. N. First Street: From E. Main Street to Pioneer Court Approx. 1.648 L.F. of Milling and Resurfacing and Stormwatcr Infrastructure

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents