Similar Projects
Bunker Hill Water Pump Station
Post-Bid
Central City, PA 15926

Saint Michael Pennsylvania South of Salix Sewer Extension Project - Pump Station and Electrical
Post-Bid
Forest Hills, PA 15221

Pump Station Construction for the Water Booster Pump Station
Results
Mansfield, PA

Water Supply System Upgrades, Tobyhanna Army Depot
Results
$5,000,000 to $10,000,000 est. value
Tobyhanna, PA

Municipal Drive Pump Station And Force Main, General/Mechanical
Construction
$1,200,000 est. value
Downingtown, PA 19372

Crum Creek Pumping Station Improvements, Contract 1 - General Construction
Construction
$6,500,000 est. value
Rutledge, PA 19070

Powerflow Fire Pump
Post-Bid
Pittsburgh, PA 15219

Construction - Circulation Pump Replacement
Results
Coraopolis, PA

Kohler Tract Pumping Station - General Construction
Construction
$1,300,000 est. value
Emmaus, PA 18049

WYE Lift Station Bar Screen Replacement
Post-Bid
Aliquippa, PA 15001

Grinder Pump - General Construction
Results
West Middlesex, PA

Construction of the Cupola Pump Station Replacement- General Construction
Construction
$750,000 to $1,000,000 est. value
Honey Brook, PA

WWTP Grey Water Pumps
Post-Bid
Less than $72,000 est. value
Pittsburgh, PA 15222

Long Term Control Plan Project 2018 Lift Station Improvements - General Construction
Results
Rochester, PA 15074

Flow Diversion - Pump Stations & Force Main Combined
Construction
North Wales, PA 19436

Last Updated 05/11/2020 01:41 PM
Project Title

Rabenold Pump Station Improvements, Sewage Pump Replacement Project

Physical Address View project details and contacts
City, State (County) Allentown, PA 18104   (Lehigh County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work will involve setting up and maintaining auxiliary pumps, removal of the existing pumps and control cabinets, and installation of the new pumps, control cabinets and appurtenances including electrical construction. 1.Mobilization/ demobilization 2.Install and maintain auxiliary bypass pumping system 3.De-energize existing pump, motor control system and appurtenances 4.Removal of existing pumps, motors, MCC panel, panel view and appurtenances 5.Install concrete motor control cabinet pad 6.Install new pump station package pumps, motors, control and associated valves and piping 7.Electrical construction 8.Arrange for manufacturer field testing of system operation 9.Dismantle auxiliary bypass pump system 10.Salvage equipment to Township.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents