Similar Projects
7 Brew Coffee / Baton Rouge
Renovation, Infrastructure
Conception
$1,000,000 CJ est. value
Baton Rouge, LA 70808

MoveBR - Mickens Rd (Hooper Rd - Joor Rd.) - City of Baton Rouge / Parish of East of Baton Rouge
Infrastructure
Conception
$25,000,000 CJ est. value
Baton Rouge, LA 70812

New Elementary School (Southern District) - East Baton Rouge Parish School System
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Baton Rouge, LA 70802

MoveBR - Constantin (Midway - Bluebonnet) - City of Baton Rouge / Parish of East of Baton Rouge
Infrastructure
Design
$8,000,000 CJ est. value
Baton Rouge, LA 70808

RFQ Construction Manager at Risk - New STEM Complex, Southern University
Demolition, New Construction, Infrastructure
Post-Bid
$37,850,000 CJ est. value
Baton Rouge, LA 70807

Alta Road Bridge Replacement Project
Demolition, New Construction, Infrastructure
Post-Bid
$696,942 CJ est. value
Bell City, LA 70630

Pecan Acres Subdivision Home Demolition And Slab Removal
Demolition
Results

Annual Roadside Drainage Project - South
Infrastructure
Results
$922,030 CJ est. value
Baton Rouge, LA 70802

Renovations and Additions, Louisiana Governors Mansion, State Capitol Park
Addition, Demolition, Renovation, Infrastructure
Construction
$450,000 CJ est. value
Baton Rouge, LA 70802

Unified Jewish Congregation of Baton Rouge Expansion
Addition, Demolition, Infrastructure
Construction
$1,000,000 CJ est. value
Baton Rouge, LA 70808

Our Lady of the Lake Interdisciplinary Science Building
New Construction, Infrastructure - 148,000 SF
Pending Verification
$109,000,000 CJ est. value
Baton Rouge, LA 70806

Gron Fuels Renewable Diesel Plant
New Construction, Infrastructure
Pending Verification
$9,200,000,000 CJ est. value
Baton Rouge, LA 70802

Commodore Pointe
New Construction, Infrastructure
Conception
$40,000,000 CJ est. value
Baton Rouge, LA 70805

Louisiana Swampbase Boat Dock
Infrastructure
Design
$135,000 CJ est. value
Baton Rouge, LA 70802

Louisiana State University, Baton Rouge, Louisiana Strategic Capital Plan, Deferred Maintenance for Infrastructure and Streets
Demolition, Renovation, Infrastructure
Post-Bid
$12,840,775 CJ est. value
Baton Rouge, LA 70808

Last Updated 10/18/2023 10:10 AM
Project Title

Home Rehabilitation & Lead Hazard Reduction Program

Physical Address View project details and contacts
City, State (County) Baton Rouge, LA 70802   (East Baton Rouge County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $40,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The services available under the Home Rehabilitation and Lead Hazard Reduction Program cannot be used to replace adequately functioning systems that do not present a hazardous or health and safety condition. Replacement of roof (30-year architectural shingles, synthetic roof felt, roof jacks, drip edge, and roof ventilation). Leaking or holes in the roof that cause interior damages and/or exposure to outside elements will be replaced. Roofs that are deteriorated or whose structure poses a hazard will be replaced. Window replacement or repair. If windows expose the home to the outside elements, they will be replaced or repaired. Replacement of exterior doors and weather-stripping. If doors expose the home to the outside elements, they will be replaced or repaired. Installation of combination smoke detector/carbon monoxide detector. If the smoke detector/carbon monoxide detector is broken or the home does not have one, a new one will be installed. Handicap accessibility for disabled owners. All handicap modifications or installations have to be ADA compliant. In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labour. In addition, contractors must be required to pay wages not less than once a week. The non-Federal entity must place a copy of the current prevailing wage determination issued by the Department of Labour in each solicitation. The decision to award a contract or subcontract must be conditioned upon the acceptance of the wage determination. The EBR Parish reserved the right in its sole discretion to select the response that best meets the needs of the city EBR Parish and to waive any informalities, technicalities, or irregularities in the response. The undersigned agrees to execute the Agreement and Affidavit and furnish to the EBR Parish all insurance certificates and performance bond required for the project within fifteen (15) calendar days after receiving notice of award from the EBR Parish. Question Deadline 10/11/2023 at 5:00 PM CT Community Meeting (In Person) The Executive Center 250 S. Foster Drive Baton Rouge, LA 70806 October 3, 2023 12:30pm CST & 6:00pm CST Community Meeting (Virtual) https://www.brla.gov/HousingRFP1230PM https://brla.gov/HousingRFP6PM October 5, 2023 12:30pm CST & 6:00pm CST

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents