Last Updated | 10/18/2023 10:10 AM |
Project Title | Home Rehabilitation & Lead Hazard Reduction Program |
Physical Address | View project details and contacts |
City, State (County) | Baton Rouge, LA 70802 (East Baton Rouge County) |
Category(s) | Heavy and Highway, Residential |
Sub-Category(s) | Single-Family Homes, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $40,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The services available under the Home Rehabilitation and Lead Hazard Reduction Program cannot be used to replace adequately functioning systems that do not present a hazardous or health and safety condition. Replacement of roof (30-year architectural shingles, synthetic roof felt, roof jacks, drip edge, and roof ventilation). Leaking or holes in the roof that cause interior damages and/or exposure to outside elements will be replaced. Roofs that are deteriorated or whose structure poses a hazard will be replaced. Window replacement or repair. If windows expose the home to the outside elements, they will be replaced or repaired. Replacement of exterior doors and weather-stripping. If doors expose the home to the outside elements, they will be replaced or repaired. Installation of combination smoke detector/carbon monoxide detector. If the smoke detector/carbon monoxide detector is broken or the home does not have one, a new one will be installed. Handicap accessibility for disabled owners. All handicap modifications or installations have to be ADA compliant. In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labour. In addition, contractors must be required to pay wages not less than once a week. The non-Federal entity must place a copy of the current prevailing wage determination issued by the Department of Labour in each solicitation. The decision to award a contract or subcontract must be conditioned upon the acceptance of the wage determination. The EBR Parish reserved the right in its sole discretion to select the response that best meets the needs of the city EBR Parish and to waive any informalities, technicalities, or irregularities in the response. The undersigned agrees to execute the Agreement and Affidavit and furnish to the EBR Parish all insurance certificates and performance bond required for the project within fifteen (15) calendar days after receiving notice of award from the EBR Parish. Question Deadline 10/11/2023 at 5:00 PM CT Community Meeting (In Person) The Executive Center 250 S. Foster Drive Baton Rouge, LA 70806 October 3, 2023 12:30pm CST & 6:00pm CST Community Meeting (Virtual) https://www.brla.gov/HousingRFP1230PM https://brla.gov/HousingRFP6PM October 5, 2023 12:30pm CST & 6:00pm CST |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |