Last Updated | 08/30/2022 12:09 PM |
Project Title | Sidewalk |
Physical Address | View project details and contacts |
City, State (County) | Clay, WV 25043 (Clay County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $141,765 [brand] Estimate |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of August 30, 2022, project was awarded to Man In The Hat Construction, awarded amount is $141,764.71. A brief description of the work is to remove a 115.50 feet by 7 feet & 7 inches section of the courthouse courtyard and replace it with a concrete side walk and curb. This will include removing the current sidewalk, curb and trees. The bricks will be salvaged for later use. The current three light poles will need removed and repositioned along the sidewalk. New PVC Conduit for light poles will need to be installed. Light poles will need wired and connected current power source. ADA Truncated Dome Pads will be required to be installed at each end of sidewalk. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |