Similar Projects
Last Updated | 10/09/2023 02:34 PM |
Project Title | Demolition of Substandard Buildings |
Physical Address | View project details and contacts |
City, State (County) | Fort Smith, AR 72904 (Sebastian County) |
Category(s) | Single Trades |
Sub-Category(s) | Environmental |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $4,950 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Notice is hereby given that the City of Fort Smith, Arkansas will receive sealed bids for the Demolition of substandard building: o 2312 n. 8th street- lot 5, blk 19; main addition, parcel 14774-0005-00019-00 The city of fort smith reserves the right to reject any or all bids and waive formalities. The price listed shall include all costs associated with the performance of the services specified, including overhead, labor, materials, equipment, tools, transportation, and all other costs incidental to complete demolition and removal of the structures indicated, including the removal and cleanup of any known asbestos, the removal of any concrete foundation walls, footings, floors, etc., and the hauling and placing of any fill material which may be required to fill remaining voids. Actual demolition shall incorporate the removal of all structures to include residential, outbuildings, sheds, and other miscellaneous structures so designated by the City. 2. Removal of all foundations, footings, slabs, asphalt walkways and driveways, debris, and other undesirable objects to the sidewalk. Care shall be taken not to damage the sidewalks or street. Any damage shall be the responsibility of the Contractor. 3. Septic systems (if applicable) shall be pumped until empty, remove and dispose of tanks, and fill in void with clean fill. All sanitary sewer lines connected to street sewer main lines shall be capped off. Areas shall be filled to grade and shall match elevation to adjoining property. 4. Foundation landscaping shall be removed unless otherwise designated. Dead trees shall be removed and the contractor shall provide fill and refill the excavated site to a level even with the surrounding area |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |