Similar Projects
Resurfacing and Related Work (High Friction Surface Treatment Application) at Various Locations
Infrastructure
Bidding
$2,305,229 est. value

Interstate Maintenance and Related Work on I-90
Infrastructure
Bidding
$22,542,465 est. value
Brimfield, Palmer, Warren, Wilbraham, MA

Adjustment, Repair and /or Reconstruction of 29 Sewer Manholes
Post-Bid
Palmer, MA

Statewide Airport Pavement Maintenance Project
Post-Bid
Less than $1,500,000 est. value

Roadway Reconstruction and Related Work (Including Signals) Along a Section of Pine Street (Route 187) (Phase 1)
Results
Less than $2,052,962 est. value
Agawam, MA 01001

Improvements and Related Work (including Signals) at Bay Street and Berkshire Avenue
Results
Less than $1,892,000 est. value
Springfield, MA 01101

Crack Sealing-Polymer and Crumb Rubber Modified (PCRM) Asphalt Compound with Reinforcing Fibers
Term Contract
Bidding
Holland, MA

Statewide Pavement Maintenance and Pavement Markings at Various Public-Use Airports
Post-Bid
Less than $1,500,000 est. value
Wakefield, MA

Resurfacing and Related Work along a Section of Interstate 90 Westbound
Results
Less than $8,466,187 est. value

Chip Seal
Term Contract, Infrastructure
Bidding
Holland, MA

South Holyoke Housing Development Project
Post-Bid
Less than $5,900,000 est. value
Holyoke, MA

Roadway Reconstruction and Related Work (Including Signals) along Sections of Main (Route 141), Appleton and Crescent Streets (Safe Routes to School - Kelly Community School)
Results
Less than $1,005,000 est. value
Holyoke, MA

Columba Street Reconstruction and Related Items 2021
Infrastructure
Bidding
Chicopee, MA

STCC AC Green Lot Repaving Project
Post-Bid
Springfield, MA 01105

Resurfacing and Related Work at Various Locations
Results
Less than $2,173,746 est. value

Last Updated 06/30/2021 09:42 AM
Project Title

Roadway Reconstruction and Related Work (Including Signals) along Sections of Western Avenue, Lloyds Hill Road, Court, High, Mill, and West Silver Streets (Phase 2)

Physical Address View project details and contacts
City, State (County) Westfield, MA 01085   (Hampden County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,657,823
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

"1.000","Ls","Schedule of Operations - Fixed Price $58,500.","100." "0.350","a","Clearing and Grubbing","101." "450.000","Ft","Tree Trimming","102.1" "3.000","Ea","Tree Protection – Armoring & Pruning","102.511" "300.000","Ft","Air Excavation and Root Pruning","102.513" "1950.000","Ft","Tree and Plant Protection Fence","102.521" "40.000","Hr","Arborist","102.55" "46.000","Ea","Tree Removed - Diameter Under 24 Inches","103." "27.000","Ea","Tree Removed - Diameter 24 Inches and Over","104." "14.000","Ea","Stump Removed","105." "13600.000","Cy","Earth Excavation","120." "85.000","Cy","Class a Rock Excavation","121." "1225.000","Cy","Topsoil Excavated and Stacked","125." "225.000","Sy","Reinforced Concrete Surface Excavation","127.3" "2875.000","Cy","Class a Trench Excavation","141." "540.000","Cy","Test Pit for Exploration","141.1" "800.000","Cy","Class B Trench Excavation","142." "230.000","Cy","Class B Rock Excavation","144." "5.000","Ea","Drainage Structure Abandoned","145." "65.000","Ea","Drainage Structure Removed","146." "110.000","Cy","Special Borrow","150.1" "4550.000","Cy","Gravel Borrow","151." "335.000","Ton","Crushed Stone","156." "10.000","Ton","Crushed Stone for Bridge Foundations","156.1" "38100.000","Sy","Fine Grading and Compacting - Subgrade Area","170." "150.000","Ft","Removal of Asbestos","182.2" "89.000","Ea","Catch Basin","201." "1.000","Ea","Offset Catch Basin","201.1" "25.000","Ea","Special Catch Basin (Lawn Drain)","201.31" "4.000","Ea","Special Catch Basin (9 Foot Depth or Greater)","201.32" "39.000","Ea","Manhole","202." "6.000","Ea","Manhole (9 to 14 Foot Depth)","202.2" "1.000","Ea","Special Manhole - Circular Structure","203.01" "6.000","Ea","Gutter Inlet","204." "20.000","Ea","Drainage Structure Adjusted","220." "5.000","Ft","Drainage Structure Rebuilt","220.2" "11.000","Ea","Drainage Structure Change in Type","220.3" "12.000","Ea","Drainage Structure Remodeled","220.5" "5.000","Ft","Sanitary Structure Rebuilt","220.6" "30.000","Ea","Sanitary Structure Adjusted","220.7" "1.000","Ea","Sanitary Structure Remodeled","220.8" "4.000","Ea","Sanitary Structure Abandoned","220.9" "59.000","Ea","Frame and Cover","221." "103.000","Ea","Frame and Grate (or Cover) Municipal Standard","222.3" "96.000","Ea","Frame and Grate (or Cover) Removed and Discarded","223.2" "1.000","Ea","8 Inch Hood","224.08" "5.000","Ea","10 Inch Hood","224.10" "75.000","Ea","12 Inch Hood","224.12" "42.000","Cy","Removal of Drainage Structure Sediment","227.3" "2000.000","Ft","Removal of Drainage Pipe Sediment","227.31" "15.000","Sf","Masonry Plug","227.4" "75.000","Ft","8 Inch Ductile Iron Pipe","238.08" "2640.000","Ft","12 Inch Reinforced Concrete Pipe","241.12" "1995.000","Ft","15 Inch Reinforced Concrete Pipe","241.15" "1305.000","Ft","18 Inch Reinforced Concrete Pipe","241.18" "10.000","Ft","24 Inch Reinforced Concrete Pipe","241.24" "70.000","Ft","10 Inch Reinforced Concrete Pipe Class V","244.10" "250.000","Ft","12 Inch Reinforced Concrete Pipe Class V","244.12" "900.000","Ft","8 Inch Corrugated Plastic (Polyethylene) Pipe","252.08" "1.000","Ls","Water Main Abandoned 6 Inch","301.06" "1.000","Ls","Water Main Abandoned 8 Inch","301.08" "10.000","Ft","4 Inch Ductile Iron Water Pipe (Rubber Gasket)","302.04" "230.000","Ft","6 Inch Ductile Iron Water Pipe (Rubber Gasket)","302.06" "210.000","Ft","8 Inch Ductile Iron Water Pipe (Rubber Gasket)","302.08" "10.000","Ft","10 Inch Ductile Iron Water Pipe (Rubber Gasket)","302.10" "1000.000","Ft","12 Inch Ductile Iron Water Pipe (Rubber Gasket)","302.12" "2000.000","Lb","Ductile Iron Fittings for Water Pipe","309." "65.000","Ft","4 Inch Water Main Removed and Stacked","315.04" "285.000","Ft","6 Inch Water Main Removed and Stacked","315.06" "45.000","Ft","8 Inch Water Main Removed and Stacked","315.08" "20.000","Ft","12 Inch Water Main Removed and Stacked","315.12" "115.000","Ft","3/4 Inch Copper Tubing Type K","347.075" "2115.000","Ft","1 Inch Copper Tubing Type K","347.1" "2.000","Ea","6 Inch Gate and Gate Box","350.06" "1.000","Ea","8 Inch Gate and Gate Box","350.08" "50.000","Ea","Gate Box Adjusted","358." "11.000","Ea","Gate Box Removed and Stacked","358.1" "47.000","Ea","1 Inch Corporation Cock","363.1" "1.000","Ea","8 X 6 Inch Tapping Sleeve, Valve and Box","370.1" "1.000","Ea","10 X 6 Inch Tapping Sleeve, Valve and Box","370.2" "8.000","Ea","12 X 6 Inch Tapping Sleeve, Valve and Box","370.4" "14.000","Ea","12 X 8 Inch Tapping Sleeve, Valve and Box","370.5" "3.000","Ea","4 Inch Transition Coupling","371.041" "8.000","Ea","6 Inch Coupling","371.06" "4.000","Ea","8 Inch Coupling","371.08" "1.000","Ea","12 Inch Coupling","371.12" "11.000","Ea","Hydrant","376." "1.000","Ea","Hydrant - Removed and Reset","376.2" "11.000","Ea","Hydrant - Removed and Stacked","376.3" "47.000","Ea","Service Box","381." "5.000","Ea","Service Box Removed and Reset","381.1" "47.000","Ea","Service Box Removed and Stacked","381.2" "5.000","Ea","Service Box Adjusted","381.3" "47.000","Ea","Curb Stop","384." "1.000","Ea","Fountain Piping System","389.4" "50.000","Ea","Sprinkler Head Removed and Reset","390." "100.000","Ft","Sprinkler System Pipe Removed and Reset","390.1" "2600.000","Cy","Dense Graded Crushed Stone for Sub-base","402." "2550.000","Sy","Pavement Fine Milling","415.2" "425.000","Sy","Cement Concrete Base Course","430." "87800.000","Lb","Calcium Chloride for Roadway Dust Control","440." "5.000","Mgl","Water for Roadway Dust Control","443." "3150.000","Ton","Superpave Surface Course - 12.5 Polymer (Ssc - 12.5 - P)","450.231" "3600.000","Ton","Superpave Intermediate Course - 19.0 (Sic - 19.0)","450.32" "5250.000","Ton","Superpave Base Course - 37.5 (Sbc - 37.5)","450.42" "105.000","Ton","Hma for Patching","451." "3950.000","Gal","Asphalt Emulsion for Tack Coat","452." "2000.000","Ft","Hma Joint Sealant","453." "1140.000","Ton","Asphalt Mixtures for Temporary Work","472." "75.000","Sy","Granite Rubble Block Pavement","485." "90.000","Sy","Granite Rubble Block Pavement Excl. Cost of Concrete Base","485.2" "11.000","Ea","Granite Curb Type Va4 - Splayed End","504.2" "2200.000","Ft","Granite Curb Type Vb - Straight","506." "160.000","Ft","Granite Curb Wall","506.01" "660.000","Ft","Granite Curb Type Vb - Curved","506.1" "205.000","Ft","Chamfered Granite Curb - Curved","507.1" "60.000","Ft","Chamfered Granite Curb - Straight","507.2" "145.000","Ft","Granite Transition Curb for Wheelchair Ramps - Straight","509." "315.000","Ft","Granite Transition Curb for Wheelchair Ramps - Curved","509.1" "7.000","Ea","Granite Curb Inlet - Straight","514." "3.000","Ea","Granite Curb Inlet - Curved","515." "10.000","Ea","Granite Curb Corner Type a","516." "4.000","Ea","Granite Curb Corner - Type C","517.01" "10900.000","Ft","Hot Mix Asphalt Curb Type 2 - Modified","570.21" "1975.000","Ft","Curb Removed and Discarded","594." "600.000","Ft","Guardrail, Tl-2 (Single Faced)","620.12" "200.000","Ft","Guardrail, Tl-2 (Single Faced) With Timber Backing","620.121" "4.000","Ea","Guardrail Tangent End Treatment, Tl-2","627.82" "950.000","Ft","Highway Guard Removed and Discarded","630.2" "240.000","Ft","96 Inch Cedar Stockade Fence","656." "225.000","Ft","72 Inch Cedar Stockade Fence","656.1" "75.000","Ft","Fence Removed and Reset","670." "15.000","Cy","Stone Masonry Wall Removed and Rebuilt Dry","690.1" "143.000","Ea","Silt Sack","697.1" "110.000","Sy","Geotextile Fabric for Separation","698.3" "2500.000","Sy","Cement Concrete Sidewalk","701." "5300.000","Sy","Cement Concrete Multi-use Path","701.01" "390.000","Sy","Flexible Porous Walk","701.02" "815.000","Sy","Cement Concrete Sidewalk at Driveways","701.1" "1100.000","Sy","Cement Concrete Wheelchair Ramp","701.2" "630.000","Ton","Hot Mix Asphalt Walk Surface","702." "5.000","Sy","Flagstone Walk Removed and Reset","705.1" "70.000","Sy","Brick Hardscaping With Cement Concrete Border","706.01" "25.000","Sy","Brick Pavers Removed and Relaid","706.8" "110.000","Sy","Texturized Decorative Pavement","706.9" "2.000","Ea","Park Bench","707.1" "1.000","Ea","Park Bench Removed and Reset","707.15" "1.000","Ea","Trash Receptacle","707.2" "5.000","Ea","Bound Removed and Reset","711." "2.000","Ea","Park Monument Removed and Reset","714.01" "2.000","Ea","Rural Mail Box Removed and Reset","715." "1.000","Ls","Flagpole Removed and Reset","718.1" "28.000","Mo","Engineers Field Office and Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "2025.000","Cy","Loam Borrow","751." "10.000","Cy","Compost Topsoil","751.71" "1225.000","Cy","Topsoil Rehandled and Spread","752." "1.000","Ls","Npdes Stormwater Pollution Prevention Plan","756." "23225.000","Sy","Seeding","765." "185.000","Sy","Seeding - Conservation Mix","765.4" "1575.000","Ft","Sediment Control Barrier","767.121" "10.000","Cy","Aged Pine Bark Mulch","767.6" "590.000","Sy","Matting for Erosion Control","767.9" "925.000","Ft","Pavement Milling Mulch Under Guard Rail","769." "15.000","Ea","Linden - Little Leaf 2-2.5 Inch Caliper","775.147" "40.000","Ea","Serviceberry - Autumn Brilliance 2-2.5 Inch Caliper","775.501" "17.000","Ea","Elm - Princeton 2.5-3 Inch Caliper","775.502" "3.000","Ea","Maple - Red - 'armstrong' 2-2.5 Inch Caliper","776.523" "3.000","Ea","Oak - Pin 2-2.5 Inch Caliper","777.138" "3.000","Ea","Birch - River 'heritage' 2.5-3 Inch Caliper","778.160" "3.000","Ea","Lilac Tree - Japanese 2-2.5 Inch Caliper","781.579" "3.000","Ea","Tulip Tree 2.5-3 Inch Caliper","783.442" "12.000","Ea","Boxwood - 'korean' 3 Gallon","785.190" "6.000","Ea","Holly - Shamrock 3 Gallon","785.621" "11.000","Ea","Juniper - 'blue Rug' 12-15 Inch","786.109" "5.000","Ea","Juniper - 'sea Green' 18-24 Inch","786.471" "5.000","Ea","Alder Shrub - Speckled 2 Gallon","788.013" "5.000","Ea","Blueberry - Highbush 2-3 Feet","789.633" "5.000","Ea","Dogwood - Silky 2-3 Feet","790.719" "3.000","Ea","Spirea - 'anthony Waterer' 2-3 Feet","793.731" "5.000","Ea","Viburnum - Arrowwood 18-24 Inches","795.009" "5.000","Ea","Rose - Pink Meidiland 2 Gallon","796.225" "6.000","Ea","Rose - Coral Drift 2 Gallon","796.3" "26.000","Ea","Dwarf Fountain Grass - 'hameln' 1 Gallon","796.423" "131.000","Ea","Daylily - Happy Returns 1 Gallon","796.768" "34.000","Ea","Daylily - Mauna Loa 1 Gallon","796.769" "100.000","Ft","1 Inch Electrical Conduit Type Nm - Plastic -(Ul)","804.1" "900.000","Ft","2 Inch Electrical Conduit Type Nm - Plastic (Ul)","804.2" "700.000","Ft","3 Inch Electrical Conduit Type Nm - Plastic -(Ul)","804.3" "6.000","Ea","Pull Box 8 X 23 Inches - Sd2.030","811.30" "17.000","Ea","Pull Box 12 X 12 Inches - Sd2.031","811.31" "10.000","Ea","Light Standard Foundation Precast","812.09" "6.000","Ea","Accent Lighting Base Precast","813.091" "2715.000","Ft","Wire Type 7 No. 10 General Purpose","813.30" "4015.000","Ft","Wire Type 7 No. 8 General Purpose","813.31" "300.000","Ft","Wire Type 7 No. 6 General Purpose","813.32" "175.000","Ft","Wire Type 7 No. 1/0 General Purpose","813.36" "975.000","Ft","Wire Type 10 - #8 Grounding and Bonding","813.52" "10.000","Ft","Ground Rod","813.70" "1.000","Ls","Service Connection (Overhead)","813.80" "1.000","Ls","Traffic Signal Reconstruction Location No. 1","816.01" "1.000","Ls","Traffic Signal Reconstruction Location No. 2","816.02" "1.000","Ls","Traffic Signal Reconstruction Location No. 3","816.03" "1.000","Ls","Traffic Control Signal Removed and Stacked","816.80" "10.000","Ea","Park Lighting Luminare and Pole","823.151" "1.000","Ls","Highway Lighting Load Center","823.60" "1.000","Ls","Solar Powered Flashing Beacon System Location No. 1","824.121" "1.000","Ls","Solar Powered Flashing Beacon System Location No. 2","824.122" "1.000","Ls","Solar Powered Flashing Beacon System Location No. 3","824.123" "4.000","Ea","Ground Mounted Accent Lighting","824.152" "1.000","Ls","Rectangular Rapid Flashing Beacon (Solar) Location No. 1","824.221" "1.000","Ls","Rectangular Rapid Flashing Beacon (Solar) Location No. 2","824.222" "1.000","Ls","Rectangular Rapid Flashing Beacon (Solar) Location No. 3","824.223" "1.000","Ls","Rectangular Rapid Flashing Beacon (Solar) Location No. 4","824.224" "1.000","Ls","Highway Warning Sign - Illuminated Removed and Stacked","824.71" "2.000","Ea","Flush Mounted Accent Lighting","825.153" "1.000","Ea","Strip Lighting","825.154" "680.000","Sf","Warning-regulatory and Route Marker - Aluminum Panel (Type a)","832." "107.000","Ea","Sign Sup (N/guide)+rte Mkr W/1 Brkway Post Assembly - Steel","847.1" "1150.000","Hr","Roadway Flagger","850.41" "275.000","Day","Traffic Cones for Traffic Management","851.1" "1500.000","Sf","Safety Signing for Traffic Management","852." "175.000","Ft","Temporary Pedestrian Barricade","852.11" "12.000","Ea","Temporary Pedestrian Ramp","852.12" "25.000","Ea","Portable Breakaway Barricade Type Iii","853.1" "1050.000","Ft","Temporary Barrier (Tl-2)","853.2" "900.000","Ft","Temporary Barrier Removed and Reset","853.21" "8.000","Ea","Temporary Impact Attenuator Removed and Reset","853.501" "6.000","Ea","Temporary Impact Attenuator Unidirectional, Non-redirective (Tl-2)","853.52" "70800.000","Ft","Temporary Paving Markings - 6 Inch (Painted)","854.016" "1000.000","Ft","Temporary Paving Markings - 6 Inch (Tape)","854.036" "9300.000","Sf","Pavement Marking Removal","854.1" "340.000","Day","Arrow Board","856." "1200.000","Day","Portable Changeable Message Sign","856.12" "50000.000","Day","Reflectorized Drum","859." "300.000","Day","Reflectorized Drums With Sequential Flashing Warning Lights","859.1" "150.000","Ft","4 Inch Reflectorized White Line (Painted)","860.104" "475.000","Sf","Pavement Arrows and Legends Reflectorized White (Thermoplastic)","864.04" "16000.000","Ft","6 Inch Reflectorized White Line (Thermoplastic)","866.106" "4600.000","Ft","12 Inch Reflectorized White Line (Thermoplastic)","866.112" "19300.000","Ft","6 Inch Reflectorized Yellow Line (Thermoplastic)","867.106" "510.000","Ft","12 Inch Reflectorized Yellow Line (Thermoplastic)","867.112" "76.000","Ea","Street Name Sign","874." "7.000","Ea","Traffic Sign Removed and Reset","874.2" "1.000","Ls","Traffic Signs Removed and Stacked","874.3" "1.000","Ls","Miscellaneous Signs Removed and Reset","874.51" "35.000","Cy","4000 Psi, 1.5 Inch, 565 Cement Concrete","901." "80.000","Cy","3000 Psi, 1.5 Inch, 470 Cement Concrete","903." "2000.000","Lb","Steel Reinforcement for Structures - Epoxy Coated","910.1" "20.000","Sy","Membrane Waterproofing","967.1" "3.000","Ton","River Cobble Fill","983.502" "3800.000","Sf","Prefabricated Concrete Modular Gravity Wall (Lloyds Hill Road Site No. 1)","996.41" "1000.000","Sf","Prefabricated Concrete Modular Gravity Wall (Lloyds Hill Road Site No. 2)","996.42" "485.000","Sf","Stone Masonry Veneer","997.1" "75.000","Sf","Stone Masonry Wall Cap","997.2" "4.000","Ea","Stone Masonry Column Cap","997.3"

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Roadway Signaling and Control Equipment, Traffic Signals.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents