Similar Projects
Fire Exhaust Fans
Post-Bid
Taylor, MI

Pellston Regional Airport Air-Cooled Scroll Water Chiller
Post-Bid
Petoskey, MI

Roseville - Mechanical Renovations - BP07
Results
Roseville, MI

Heating, Ventilation and Air Conditioning (HVAC) Equipment and Building Control Systems Maintenance
Results
Less than $142,000 est. value
Wayne, MI

2019 HVAC Improvement Project
Term Contract
Post-Bid
Less than $616,000 est. value
Niles, MI 49120

East Lansing High School Plumbing And Hvac Improvements
Results
Lansing, MI 48900

Retrofits to Existing Roof-Top Units Serving Science Labs
Post-Bid
Saint Joseph, MI

IT Server Room Cooling Unit at the Irwin L. Davis Instructional Center
Results
Flint, MI 48507

A/C System Install - Air Conditioning System Installation for Gilbert Lodge
Post-Bid
Traverse City, MI

M and M Chiller Replacement
Results
Less than $50,000 est. value
Houghton, MI

Schembechler Glenn E Hall – HVAC Upgrades
Post-Bid
Ann Arbor, MI

HVAC Contractor Services
Term Contract
Results
Detroit, MI 48226

Hood Cleaning and Degreasing Services
Term Contract
Post-Bid
Rochester, MI

Foundry Ventilation Upgrades
Results
Less than $50,000 est. value
Houghton, MI

HVAC Preventative Maintenance Program
Post-Bid
Saline, MI

Reported 10/01/2020 12:00 AM
Project Title

Water Cooler Replacement Bid

Physical Address View project details and contacts
City, State (County) Houghton Lake, MI   (Roscommon County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Water cooler bid for the following: Removal of 20 wall mount water coolers located at: Jr/Sr High School Collins Upper/Lower Elementary Community Education Center Replace all units with water cooler/bottle fill stations. Fill station Brand and Model # is ELKAY, #LZS8WSSP. Remove two recessed fountains in the Collins Upper Elementary gym and four in the Jr/Sr High School gym area. Replace two recessed fountains in the Collins Upper Elementary and four at the Jr/Sr High School gym locations with recessed ELKAY model # LBWDO6WHK. At the Jr/Sr High School location, remove four recessed waste fountains from wall adjacent to the water fountains. Cover with approved method by the district. All electrical circuits will be the responsibility of the awarded contractor.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents