Similar Projects
Driveway Apron for Rainbow Lakes Substation
Bidding
Sumterville, FL

CDBG Repaving and Flood and Drainage Improvements
Results
Less than $566,054 est. value
Wildwood, FL 34785

Traffic OPS Improvement
Results
Less than $1,000,000 est. value

Sumter County Buena Vista Boulevard Phase 2 Rehabilitation from 300 Feet South of Lake Miona to North of C-44A Roundabout
Results
Wildwood, FL 34785

Sumter County Morse Boulevard Phase 2 from 1,000 Feet South of Stillwater Trail to SR 44
Results
Less than $3,066,768 est. value
Wildwood, FL 34785

Sumter County C-466A Eastbound From Canal Street to Morse Boulevard
Results
Less than $459,977 est. value
Wildwood, FL 34785

25th Street Crossing Improvement Project
Results
Less than $488,888 est. value
FL

Sumter County C-478 from US 301 to the City of Center Hill Southern Limits Resurfacing Project
Results
Less than $970,700 est. value
Wildwood, FL 34785

Sumter County C-478 Widening Between US 301 and SR 471
Results
Less than $4,498,933 est. value
FL

Walker Avenue, West Palm Avenue, and Jasper Street Overlay
Results
Less than $199,173 est. value
Bushnell, FL 33513

Resurfacing, Reconstruction, Widening
Results
Less than $2,025,463 est. value
FL

Emergency Roadside Assistance Services (I-75)
Results

Design Build Push Button Contract No. 2 – Program Management
Results

Asphalt Painting and Sealing - SECO HQ Building
Results
Sumterville, FL 33585

Emergency Roadway Repair
Results
Less than $1,000,000 est. value

Last Updated 11/16/2020 09:37 AM
Project Title

C-478 Resurfacing form SR 471 to Center Hill

Physical Address View project details and contacts
City, State (County) FL   (Sumter County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,278,700
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Board of Sumter County Commissioners wishes to solicit sealed bids from qualified contractors for construction of C-478 Resurfacing from SR 471 to Center Hill. This project consists of the resurfacing and partial reconstruction of CR 478 from SR 471 (MP 5.28) to the southern limits of the City of Center Hill (MP 10.59). The total length of work is approximately 4.3 miles, and the length of the project is approximately 5.1 miles. Roadway improvements will include milling and resurfacing, full depth roadway reconstruction in areas of base failure, constructing driveway turnouts, signing and pavement markings, and raised pavement markers (RPM). CONTRACT TIME: Will be 130 calendar days to substantial completion with an additional 20 calendar days for final project completion for a total of 150 calendar days. Substantial completion is defined as all items, not dependent on a curing period, have been completed. Final completion is defined as all pay items being completed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents