Similar Projects
Lacey Shop HVAC Repairs
Alteration
Bidding
$70,000 est. value
Lacey, WA 98503

Capital Hill Roof and HVAC Replacement
Alteration
Bidding
$875,000 to $1,007,500 est. value
Seattle, WA 98102

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

North Franklin School District Connell High School HVAC Replacements
Alteration
Results
Connell, Pasco, WA 99326

51st Circle HVAC Purchase and Installation
Alteration
Results
Vancouver, WA 98661

Supply and Install Ductless Heat Pump Systems to Single Family Residences
Alteration
Bidding
Longview, WA

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Clallam County Courthouse VAV Replacement Project
Alteration
Results
$330,000 est. value
Port Angeles, WA 98362

HVAC and Air Filtration Systems
Renovation, Alteration
Post-Bid
Sunnyside, WA

Headquarters Diesel Exhaust Removal System
Alteration
Results
$92,500 est. value
Belfair, WA 98528

City Hall HVAC Monitoring
Alteration
Post-Bid
$28,840 est. value
Sammamish, WA 98075

3rd Floor Judges Chambers HVAC Project
Alteration
Results
$90,000 to $110,000 est. value
Bellingham, WA 98225

Master Contract for HVAC Service - Statewide Opportunities
Term Contract
Post-Bid

65th Campus HVAC Makeup Air Unit
Alteration
Results
$85,000 to $95,000 est. value
Vancouver, WA 98661

Reported 03/26/2022 12:00 AM
Project Title

Stem Academy HVAC Replacement

Physical Address View project details and contacts
City, State (County) Bremerton, WA 98312   (Kitsap County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

description of work under this Section affected by alternates. The HVAC replacements at West Hills STEM Academy includes the following scope of work: Replace 30 VAV terminal units with new controllers and integrate into DDC system. Provide new fans, motors, heating water coils, and unitary DDC controllers for the air handling units AHU-2, AHU-3, and AHU-4 along with air handler controls sequence programming and integration to make a complete and functional system. Replacement of 3 boilers, two heating water pumps, addition of pump VFDs and integration into DDC system. DDC Integration for HVAC system includes outside air damper actuators, return air dampers actuators, supply fans, heating water coil control valves, heating water coil circulation pumps, duct temperature sensors, duct static pressure sensors, terminal unit damper actuators, space temperature sensors, and other components and points included in the DDC Points Matrix, System Control Diagrams, and Sequence of Operations. DDC Integration for Heating Water System includes the boilers, pump VFDs, automatic flow control valves, and other components and points included in the DDC Points Matrix, System Control Diagrams, and Sequence of Operations

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents