Similar Projects
Construction of the Cree Meadows Trail Project
Bidding
Ruidoso, NM 88345

Airport Road Sidewalks
Bidding
Las Cruces, NM

Construction Services
Post-Bid
Bernalillo, NM 87004

North NM 314 Bike and Pedestrian Improvements
Post-Bid
Los Lunas, NM 87031

Senior Center Service Access Parking Lot Reconstruction
Results
Las Vegas, NM

Parking Lots Improvement Project
Results
Less than $745,753 est. value
Clovis, NM

Copper King Trail Improvements
Post-Bid
Red River, NM 87558

Construction of the Tyrone Townsite ADA Improvements
Results
Silver City, NM

Sunland Park Street Paving and Sidewalk Construction On-Call
Post-Bid
Sunland Park, NM 88063

On-Call Landscape Contract
Results
Less than $4,658,834 est. value
Albuquerque, NM

Sidewalk and Retaining Wall Installation
Post-Bid
Chinle, Red Valley, Window Rock, AZ - Nageezi, Pinedale, Sanostee, Tohatchi, NM 86515

Visitors Center Pedestrian and Trailhead Improvements NMDOT Highway Safety Improvements Program
Results
Silver City, NM 88061

Parking Area
Post-Bid
Taos, NM 87710

Eva B Stokely Elementary Asphalt Parking Lot
Results
Shiprock, NM 87420

Construction of the El Camino and River Walk Pedestrian and Bicycle Paths Project
Post-Bid
Las Vegas, NM 87701

Last Updated 01/07/2020 11:55 AM
Project Title

Z--FCCO Parking Lot Rehabilitation

Physical Address View project details and contacts
City, State (County) Farmington, NM 87401   (San Juan County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work required includes, but is not limited to, Full Depth Reclamation (FDR), demolition, required improvements, barrier curbing, engineered ADA compliant parking spaces, pedestrian walkways, pavement striping and markings, traffic control services, crack sealing, slurry seal treatment, concrete wheel stops, and staging for government vehicle access. Grading of a dirt swale is also a requirement, as well as some temporary striping applications.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents