Similar Projects
Reported | 12/11/2019 12:00 AM |
Project Title | FAMU Student Affairs Center for Access and Student Success |
Physical Address | View project details and contacts |
City, State (County) | Tallahassee, FL (Leon County) |
Category(s) | Education |
Sub-Category(s) | College/University |
Contracting Method | Competitive Bids. |
Project Status | Sub-Bidding |
Bids Due | View project details and contacts |
Estimated Value | $26,000,000 |
Plans Available from | Construction Manager - 11/19/19 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Florida A&M University, on behalf of its Board of Trustees, announces that Construction Management services will be required for the project listed above. PROJECT LOCATION: Located on Florida A&M University's campus, the project consists of site development, all or partial demolition of Diamond and McGuinn dormitory halls and new construction. Project will be approximately 73,000 GSF housing the new FAMU Center for Access and Student Success. PROJECT DESCRIPTION: The proposed facility will house the new FAMU Center for Access and Student Success. This multipurpose building will house recruitment, admissions, financial aid, registrar, student accounts, Center for Disability Access and Resources, Undergraduate Student Success Center, computer labs, study space, student meeting space, police sub-station, and possibly auxiliary space and veteran's services. PROJECT PHASING: The project is projected to be completed in multiple phases contingent on funding. The initial phase, currently funded is set at approximately $6.1 million dollars. Additional phases are planned, with a total construction budget being $26,000,000. The project time frame anticipates a Fall 2016 construction start with completion and occupancy Spring of 2018. The contract for Construction Management Services shall consist of a pre-construction services phase and a construction phase. The pre-construction services phase, for which the Construction Manager will be paid a fixed fee, will include value engineering, constructability analysis, development of cost models, estimating, and the development of a Guaranteed Maximum Price (GMP) at the 75% Construction Document phase. If the GMP is accepted, the Construction Phase will be implemented. Early bid packages for fast track and multi-phase development may be required to meet project goals. In the Construction Phase of the contract, the Construction Manager becomes the single point of responsibility for performance of the construction of the project and shall publicly bid trade contracts. Failure to negotiate an acceptable fixed fee for Phase 1 of the contract, or to arrive at an acceptable GMP within the time provided in the agreement, may result in the termination of the Construction Manager's contract. BID GROUP C - Specific Trades: Final Cleaning; Concrete; Masonry; Structural & Misc Steel; Cold Formed Metal Roof Truss System; Aluminum Railings and Specialty Railings; Cabinets, Casework and Millwork; Roofing; Waterproofing Systems; Fireproofing; Joint Sealants; Doors, Frames and Hardware; Windows, Storefront, Curtainwall, Glass and Glazing; Framing, Drywall, Stucco and EIFS; Hard Tile; Acoustical Ceilings; Carpet and Resilient Flooring; Painting; Specialties; Residential Appliances; Window Treatments; Fountain; Elevators; Fire Protection; Plumbing; HVAC; Electrical; Unit Pavers; Landscaping & Irrigation |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |