Reported 08/14/2020 12:00 AM
Project Title

Pre Qualified Maintenance: HMA Main St to I-69, Calhoun Co

Physical Address View project details and contacts
City, State (County) Burlington, MI 49029   (Calhoun County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Hot Mix Asphalt (HMA) 2-inch mill and overlay on M-60 from rumble strip to rumble strip beginning at the easterly spring point of Main St. in Burlington Control Section (CS) mile point 4.392, heading easterly to approximately 550 feet west of the I-69 Southbound off-ramp CS mile point 8.245 (See 210911_Proposal.pdf LOG OF PROJECT). Inlet protection, maintenance of traffic, and pavement markings will also be provided by the Contractor.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents