Similar Projects
Canal Replacement Cost Share - Segment 5 - City of Brentwood
Infrastructure
Conception
$4,986,270 est. value
Brentwood, CA

Cerritos Drive to Dunning Drive Access and Drainage Improvements - City of Laguna Beach
Alteration
Conception
$400,000 est. value
Laguna Beach, CA

Riverside Levees Pl 84-99 Rehabilitation Project
Renovation, Infrastructure
Design
$25,000,000 to $100,000,000 est. value
Riverside, CA

To Replace and Remediate the Existing Corroding Culverts
Infrastructure
Design
$21,181,000 est. value
Belmont, CA 94002

West Orange County and Lower Feeder Blow-off Drain Line Rehabilitation
Infrastructure
Bidding
$175,000 to $225,000 est. value
Los Angeles, CA

Littlerock Sediment Removal Phase 2 Years 1-5 (FY 2022-2026)
Term Contract, Infrastructure
Bidding
Palmdale, CA 93552

SB Minor B - Drainage Improvement
Infrastructure
Post-Bid
$295,143 est. value
CA

Lucas Valley Road MP 3.92 Slope Improvements
Infrastructure
Post-Bid
$673,230 est. value
San Rafael, CA 94911

Compost Leachate Pond Improvements
Renovation
Results
$1,900,000 est. value
Auburn, CA 95603

2020-21 Community Development Block Grant Project
Infrastructure
Results
$1,800,000 est. value
San Mateo, CA

Storm Drain Improvements - City of Eureka
Infrastructure
Conception
$7,000,000 est. value
Eureka, CA

Arroyo Simi Grade Structure No. 14 Replacement
Infrastructure
Bidding
$2,915,815 est. value
Ventura, CA

Minor B SB Replace Culvert and Install Cured in Place Pipeliner
Infrastructure
Post-Bid
$88,000 est. value
Sacramento, CA

Upper Mormon Slough Critical Erosion Repair
Infrastructure
Results
$5,387,900 to $6,136,214 est. value
Escalon, CA 95320

San Bruno Mountain Owl and Buckeye Habitat Enhancement Project
Infrastructure
Bidding
Half Moon Bay, CA

Reported 06/28/2022 03:14 PM
Project Title

Samoa Boat Launch Improvements - City of Eureka

Physical Address View project details and contacts
City, State (County) Eureka, CA 95501   (Humboldt County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will improve ADA access to the parking lot and restroom on site, replace the existing motorized dock, and create a new dock for non-motorized vessels. As of June 27, 2022, this project is currently in the FY 2022-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents