Similar Projects
Replacement of Buried Steam Piping
Alteration
Bidding
Less than $300,000 est. value
Amherst, MA

Boiler Inspection
Term Contract
Bidding
Hanscom A F B, MA

Create Two Fully-Accessible Units - Sub Bid
Alteration
Sub-Bidding
Rockland, MA

Construction Manager at Risk Services for the Expanded Capacity
Post-Bid
Less than $15,000,000 est. value
Boston, MA

Boiler Replacement Indian Head Elementary School
Post-Bid
Less than $179,000 est. value
Hanson, MA 02341

Somerville City Hall Boiler Renovation - General Bids
Term Contract
Results
Less than $668,377 est. value
Somerville, MA 02143

Somerville City Hall Boiler Renovation - Filed Sub Bids
Term Contract
Results
Less than $668,377 est. value
Somerville, MA 02143

Chiller Controls
Term Contract
Bidding
MA

Annual Contract for Servicing, Repairing, and Maintenance of HVAC and Related Mechanical and Plumbing Systems
Term Contract
Post-Bid
$320,000 est. value
Newton Highlands, MA 02461

Replacement of Filters at Kennedy Pool
Term Contract
Results
$120,000 est. value
Somerville, MA 02143

Remove and Install Hot Water Heaters
Alteration
Bidding
Shelburne Falls, MA

Stone Ballasted Single Ply Roofing and Mechanically Attached Rigid Insulation
Post-Bid
Less than $125,000 est. value
Lunenburg, MA 01462

Air Compressor System Services
Results
$130,000 est. value
Chelsea, MA

Corrosion Inhibitor for the Water Treatment Plant
Post-Bid
Methuen, MA

Hot Water Heating System Flush and Re-Fill for Dracut Police Station
Results
Dracut, MA

Last Updated 06/30/2021 02:55 AM
Project Title

Cardinal Medeiros Boiler and Domestic Water Heater Replacement Project - General Bid

Physical Address View project details and contacts
City, State (County) Fall River, MA 02720   (Bristol County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $265,540
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of: Removal of the existing gas fired heating hot water boilers and gas fired hot water heater with new condensing gas fired heating boilers and gas fired hot water heater

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents