Similar Projects
Birch Force Main
Renovation
Results
Nampa, ID

Western Regional Lift Station
Renovation
Results
Nampa, ID

Bentley Lift Station Rehabilitation Pre-Qualification
Renovation
Results
Post Falls, ID

Booster Station Replacement - Phase II
Renovation
Results
$2,800,000 to $3,100,000 est. value
Moscow, ID

New Meadows Water System Improvements Project
New Construction, Infrastructure
Bidding
$2,500,000 est. value
New Meadows, ID

Lud Drexler Dump Station
New Construction, Demolition, Infrastructure
Design
$25,000 to $100,000 est. value
Twin Falls, ID

Parkcenter Park Pump Station Improvements
Renovation
Results
Boise, ID 83706

P Street Lift Station Replacement
Renovation
Post-Bid
$164,000 est. value
Plummer, ID

Construction of the Palmer Lift Station Upgrade Project
Renovation
Results
$350,000 est. value
Eagle, ID 83616

Reported 07/13/2022 12:00 AM
Project Title

McCammon Lift Station 3 Improvements

Physical Address View project details and contacts
City, State (County) McCammon, ID   (Bannock County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $180,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of rehabilitating the existing lift station with a new top section, lid, pumps, piping, slide rails, and installing a new valve vault. It also includes installing two 4 feet diameter manholes, 61 feet of sewer pipe, performing core drilling, and modifying a lift station pump panel.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents