Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Interchange Project and Related Work
Infrastructure
Bidding
Riverside, CA 92501

Pavement Rehabilitation Program - Citywide - Meadowview / Paloma Del Sol
Infrastructure
Bidding
$3,100,000 est. value
Temecula, CA

Riverside Facility Asphalt Overlay Project
Infrastructure
Post-Bid
Riverside, CA 59968

Pavement Striping, Markings and Markers
Infrastructure
Post-Bid
Cathedral City, CA 92234

2021 Citywide Slurry Seal Project
Infrastructure
Results
$3,200,000 est. value
Murrieta, CA 92562

52nd Avenue Resurfacing Monroe Street to Van Buren Street Project No. D0-0065 and Calhoun Street Reconstruction 54th Avenue to 0.12 Miles North of 52nd Avenue Project No. C9-0012
Infrastructure
Results
$1,390,000 to $1,620,000 est. value
Riverside, CA 92519

Citywide Slurry Seal Program Fiscal Year 2021/22
Term Contract
Bidding
$2,300,000 est. value
Temecula, CA

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

McCall Boulevard Resurfacing
Infrastructure
Results
Menifee, CA 92584

D Street Concrete Paver Repair and Sidewalk Improvements
Infrastructure
Bidding
$600,000 est. value
Perris, CA 92570

Dales Drive and Parkridge Avenue Street Improvement
Infrastructure
Post-Bid
Norco, CA 92860

2020/2021 SB-1 Street Maintenance Improvements
Infrastructure
Results
$5,147,829 est. value
Riverside, CA 92519

2022 Residential Slurry Seal Project
Infrastructure
Bidding
$750,000 est. value
Eastvale, CA

Hillside Avenue Reconstruction Project
Alteration
Post-Bid
Norco, CA 92860

Last Updated 06/30/2022 10:35 AM
Project Title

2021/22 Citywide Pavement Rehabilitation

Physical Address View project details and contacts
City, State (County) Hemet, CA 92543   (Riverside County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of mobilization and demobilization, traffic control, site preparation and street sweeping, concrete work, unclassified excavation, placement of CMB/AC, restriping of all traffic markings and legends in a paint or thermoplastic application, installation of all raised traffic markers and delineators, storm water and erosion control, public notification, and other miscellaneous work, and labor, materials, equipment and transportation necessary for the project as described in these documents.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents