Similar Projects
Reported | 05/25/2022 12:00 AM |
Project Title | Engineering Consulting Services for Infiltration and Inflow (I and I) Program |
Physical Address | View project details and contacts |
City, State (County) | Hollywood, FL (Broward County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | Accepting Qualifications, Construction Start Expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Wastewater collection system includes 85 sewer lift stations, 68 miles of force main, 206 miles of sewer gravity mains, and 4,399 sewer manholes. Department of Public Utilities ("Department") is evaluating infiltration and inflow ("I&I") into its wastewater collection systems. The program will be split into two phases. Phase 1 will consist of flow and rainfall monitoring,16 RFQ-4717-22-OT Engineering Consulting Services for Infiltration and Inflow Program analysis of each sewer collection basin to identify inflow quantities and categorizing Rainfall Dependent Inflow and Infiltration ("RDII"). Phase 2 will initiate I&I Source Investigation, hiring a contractor to perform dye testing, closed-circuit television ("CCTV") inspection, and other tools as necessary to investigate basins identified during Phase 1. Repair and rehabilitation will be implemented to address identified I&I issues.City of Hollywood wastewater collection system includes 85 sewer lift stations, 68 miles of force main, 206 miles of sewer gravity mains, and 4,399 sewer manholes |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |