Similar Projects
Ancient Trails 12KV Distribution Line and Substation - 39233 - City of Aztec
Infrastructure
Conception
$3,700,000 CJ est. value
Aztec, NM 87410

Main Street and San Juan Boulevard Intersection Upgarde - City of Farmington
Infrastructure
Conception
$250,000 CJ est. value
Farmington, NM 87401

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP - San Juan Lateral Water Treatment Plant (SJLWTP)
New Construction, Infrastructure
Bidding
$350,000,000 CJ est. value
Waterflow, NM 87421

RFQ Contractor - El Vado Dam Spillways and Dam Crest Modification Project
Infrastructure
Post-Bid
$86,000,000 CJ est. value
Tierra Amarilla, NM 87575

Aztec Airport Improvements 2022 Runway 8-26 Lighting and Visual Aids
Infrastructure
Post-Bid
$400,000 CJ est. value
Aztec, NM 87410

2021 Manhole and Water Valve Adjustment
Infrastructure
Results
$291,400 est. value
Farmington, NM

Y--NM-Valle De Oro NWR-Water Control Wetland 1 & 2 On
Term Contract
Results
Albuquerque, NM 87105

Broadway and Butler Intersection Upgarde - City of Farmington
Infrastructure
Conception
$250,000 CJ est. value
Farmington, NM 87401

Cedar Hill Pedestrian Bridge Rehabilitation Project
Infrastructure
Bidding
$200,000 CJ est. value
Aztec, NM 87410

Agriculture MP Site Work Project
Infrastructure
Post-Bid
$563,000 CJ est. value
Shiprock, NM 87420

East Culpepper Water Connection for North Star MDWCA
Infrastructure
Results
$2,900,794 est. value
Aztec, NM

Rehabilitate Taxiway A - Construction - City of Farmington
Infrastructure
Conception
$320,000 CJ est. value
Farmington, NM 87401

Engineering, Procurement and Construction for Bluffview Substation
New Construction, Infrastructure
Post-Bid
$17,323,590 CJ est. value
Farmington, NM 87401

Hydro Excavation, Multi-Term Contract
Infrastructure
Results
Farmington, NM

Last Updated 01/04/2023 07:06 AM
Project Title

South Aztec Water Transmission Line - 36372 - City of Aztec

Physical Address View project details and contacts
City, State (County) Aztec, NM 87410   (San Juan County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $7,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To plan, complete archaeological and environmental studies, design, obtain utility easements and construct 12" water transmission line in the City of Aztec, San Juan County The City of Aztec is ready to accept funding to design and construct a replacement of 14,500 feet of 12 inch water transmission line within the municipal limits of Aztec. This is a regional water line providing connection between the City of Aztec and the City of Bloomfield constructed in 2003 and has begun failing due to corrosive soils. The City is replacing small portions of the line as water breaks occur. This line is a vital connection between the two municipalities providing critical water supply to both entities in emergency situations when regular water supply has not been available. Due to the need for the line to remain in service, the line replacement will parallel the existing line but may require new environmental and cultural reports as well as new utility easements. Project process will be: Issue a RFP for design & construction management services and formal bid for construction as per the State of New Mexico Procurement Code. As of January 3, 2023, this project is currently in the City of Aztec 2023-2027 Capital Improvement Plan (CIP). Funding for this project is allotted in the City's capital improvement plan for construction FY 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents