Similar Projects
Northern Regional Water Delivery Project - Segment C
Infrastructure
Bidding
$700,000 est. value
Monument, CO

2.0 Million Gallon (MG) Water Tank Pipeline
Infrastructure
Bidding
$3,475,000 est. value
Monument, CO

6-Inch CIP Water Main Lining
Infrastructure
Post-Bid
Colorado Springs, CO 80900

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Centralized Treatment Raw Water Line
Results
$300,000 to $350,000 est. value
Colorado Springs, CO 80906

Northern Regional Water Delivery Project Segment D
Infrastructure
Construction
Less than $500,000 est. value
Monument, CO

Upper West to East Water Transmission Line
Infrastructure
Post-Bid
$8,000,000 est. value
Colorado Springs, CO 80902

Well No 4 Treatment Plant Connection Line
Results
Fountain, CO

Fire Hydrant Flushing
Term Contract
Post-Bid
Manitou Springs, CO

Water System Improvement Project
Results
Falcon, CO

Adaman Alley Construction Services
Infrastructure
Post-Bid
$1,500,000 to $2,000,000 est. value
Colorado Springs, CO

Water Utility Construction Services
Results
Less than $23,665 est. value
Colorado Springs, CO 80919

Rolling Hills Tank Inlet Pipeline
Results
Colorado Springs, CO

Cellular Domestic Water Meter Installation
Results
Colorado Springs, CO

Last Updated 05/25/2022 03:58 AM
Project Title

Water Distribution Service Saddle Replacement Program

Physical Address View project details and contacts
City, State (County) Monument, CO   (El Paso County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $180,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bids received after this time will not be accepted and will be returned unopened. At said place and time, and promptly thereafter, all bids that have been duly received will be publicly opened and read aloud. All interested parties are invited to attend. Work to be performed includes, but is not limited to: All labor, equipment, and materials necessary to remove up to 40 existing water service saddles and replace them with new service saddles specified in Section 01600 on existing 6" or 8" domestic water distribution pipelines, up to 3250 total square feet of asphalt surface replacement (i.e., up to forty 8' x 10' asphalt patches), traffic control measures, customer notifications, coordination for District inspections, and all associated permits, testing, and appurtenances.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents