Similar Projects
Parking Lot 62W-IM West Reconstruction
Post-Bid
East Lansing, MI

US-31 Connection, Reconstruction of I-94, and Reconstruction of I-94BL
Post-Bid
MI

Remove / Replace Parking Lot D - Bldg 6914
Results
$100,000 to $250,000 est. value
Battle Creek, MI 49037

Bird Elementary School Paving Expansion and P-CEP JV Track and Field Replacement Project
Results
Plymouth, MI

Nonstructural HMA 31A 1.5" Overlay
Construction
Less than $60,000 est. value
Thompsonville, MI 49683

Osmo Street Improvements
Post-Bid
Kaleva, MI

Miller Road Streetscape
Results
Swartz Creek, MI

Contractor Qualifications 2019-2020 Infrastructure Improvement Projects
Post-Bid
Southfield, MI 48076

Minor Roadways Rehabilitation
Results
Less than $883,040 est. value
Canton, MI

I-275 Road Rehabilitation Project
Post-Bid
MI

Roseville RHS Fieldhouse And Elementary Pavement Improvements BP10
Results
Roseville, MI 48066

Mass Grading, Site, Site Utility, Paving and Building Work
Post-Bid
Gladwin, MI

Jones Lake Road
Results
Grayling, MI

Cold Patch-High Performance, Annual Estimated Quantities
Term Contract
Post-Bid
Beverly Hills, MI

2019 Primary and Local Road Program
Results
Mason, MI

Last Updated 05/12/2020 09:40 AM
Project Title

2020 Paving Bid

Physical Address View project details and contacts
City, State (County) Boon, MI   (Wexford County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This work involves the overlaying of bituminous pavement over the existing pavement to achieve strength and proper cross section and where necessary and directed by engineer. Some locations may require a scratch course pulled through then finish course pulled through with mainline. The Wexford County Road Commission will perform preparatory work, and aggregate shoulder work if necessary after bituminous paving is complete. The contractor will be responsible for all items of work listed in the Bid Proposal. In locations with lots of driveways contractor is responsible to have sufficient staff and equipment finish the widening to the driveways with accounting for the speed of cooling, workability of material, making sure to not affect ride quality of the mainline. South Lake Mitchell Drive 31Rd to 33 ½ Rd- wedging/Scratch 1,500 Ton Overlay 2,750 Ton Benson Rd- Wedging/scratch 250 Ton then Overlay 1250 Ton Cherry Lane- Wedging/scratch 50 Ton then Overlay 350 Ton Lisa Cae- Wedging/scratch 50 Ton then Overlay 400 Ton JoElle DrWedging/scratch 50 Ton then Overlay 350 Ton Valley Forge- Wedging/scratch 50 Ton then Overlay 950 Ton Wedgwood Court- Wedging/scratch 15 Ton then Overlay 130 Ton 12 Rd - Wedging/scratch 500 Ton then Overlay 3800 Ton Windsong Ln- Wedging/scratch 30 Ton then Overlay 675 Ton Lamplighter Lane- Wedging/scratch 200 Ton then Overlay 1050 Ton Liberty- Wedging/scratch 150 Ton then Overlay 600 Ton Independence Ave- Wedging/scratch 50 Ton then Overlay 600 Ton 20 Rd 47 Rd to Seeley- Wedging/scratch 500 Ton then Overlay 1475 Ton 39 Rd 16 ½ Rd to 16 RdWedging/scratch 250 Ton then Overlay 750 Ton 4 Rd between 7&9- Wedging/scratch 400 Ton

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents