Similar Projects
Upper Ramble Early Package
Infrastructure
Bidding
$500,000 est. value
Fayetteville, AR

Seal Coating and Re-Striping of the Parking Lot at Arvest Ballpark
Infrastructure
Post-Bid
Springdale, AR 72762

Viney Grove Road - Phase I improvements
Infrastructure
Post-Bid
Prairie Grove, AR 72753

Prairie Grove and Siloam Springs Overlay
Results
Prairie Grove, Siloam Springs, AR

Richmond Road Surfacing
Infrastructure
Results
Farmington, AR 72730

Construction of the Mission-Razorback Connector
Infrastructure
Post-Bid
Fayetteville, AR

North 40th Street Improvements
Infrastructure
Results
Springdale, AR 72762

I-49 – Benton Co. Line (Sel. Secs.) (S)
Infrastructure
Post-Bid
AR

2021 Springdale Street Overlay
Infrastructure
Results
Less than $850,000 est. value
Springdale, AR

High Performance Cold Mix
Infrastructure
Post-Bid

Y1LB--564-21-2-635-0001 - 564-20-550 LRP Connecting Road
Term Contract
Results
$250,000 to $500,000 est. value
Fayetteville, AR 72703

Refurnish Oval of Circle Drive
Term Contract
Post-Bid
$2,000,000 to $5,000,000 est. value
Fayetteville, AR 72703

Fulbright Ramp - North Shiloh Drive Improvements
Infrastructure
Results
Fayetteville, AR 72702

2022 Springdale Street Overlay
Infrastructure
Post-Bid
$400,000 est. value
Springdale, AR

Statewide CLRS Improvements
Infrastructure
Results

Last Updated 06/24/2022 12:08 PM
Project Title

Harmon Avenue and Center Street Intersection Improvements

Physical Address View project details and contacts
City, State (County) Fayetteville, AR 72701   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

For the improvements of Harmon Avenue & Center Street Intersection Improvements. The contract consists of roadway widening of Clinton Dr. and Harmon Ave. as they approach the intersection of Hamon Ave. and Center St./ Clinton Dr., in order to accommodate proposed turn lanes, and approximately 150 LF of reconstructed Oak Ridge Trail realigned to fit the needs of the expanded roadway, 23,300 SF of 2” asphalt mill & overlay, a reinforce concrete retaining wall and four block retaining walls of variable heights, associated earthworks curb & gutter, sidewalk, driveway tieins and striping, installation of electrical conduit to assist with the relocation of overhead electric to underground electric and intersection signalization. Construction of stormwater drainage improvements that are not in the direct vicinity of the intersection are also included.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents