Similar Projects
Eight 05 Laurel Mixed-Use Development / Brainerd
New Construction, Infrastructure
Design
$18,000,000 CJ est. value
Brainerd, MN 56401

Lum Park Road and Boat Launch Drive Construction
Infrastructure
Bidding
$3,000,000 CJ est. value
Brainerd, MN 56401

Lum Park Road and Boat Launch Drive Construction
Infrastructure
Bidding
$3,000,000 CJ est. value
Brainerd, MN 56401

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Design Replace Building 22 Pipe RTC-Brainerd
Renovation, Infrastructure, Alteration
Results
Brainerd, MN

North Brainerd Reconstruction
Infrastructure
Results
$400,000 est. value
Brainerd, MN 56401

The Lofts at Novotny Multi-Residential Development / Baxter
New Construction, Infrastructure - 73,000 SF
Construction
$24,000,000 CJ est. value
Baxter, MN 56425

2019 Referendum - Phase IV Summer 2023 Projects Cuyuna Range Elementary School
Renovation, Infrastructure - 23,284 SF
Construction
$1,000,000 CJ est. value
Crosby, MN 56441

Pinehurst Apartments
New Construction, Infrastructure
Pending Verification
$109,000,000 CJ est. value
Baxter, MN 56425

Bruce Clark Storage Facility
New Construction, Infrastructure - 10,400 SF
Pending Verification
$1,000,000 CJ est. value
Brainerd, MN 56401

Rental Equipment: Road Construction and Maintenance
Term Contract
Post-Bid
$1,500,000 to $2,000,000 est. value

2022 Street and Utility Improvement Project
Infrastructure
Results
$2,753,029 est. value
Crosby, MN

Construct Conventional Hangar
New Construction, Infrastructure
Post-Bid
$4,500,000 CJ est. value
Brainerd, MN 56401

New Water Treatment Plant
New Construction, Infrastructure
Results
$5,206,300 CJ est. value
Ironton, MN 56455

Last Updated 07/24/2023 02:22 PM
Project Title

Directional Drilling Forcemain River Crossing

Physical Address View project details and contacts
City, State (County) Brainerd, MN 56401   (Crow Wing County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Grubbing & Clearing, Sewer Force Main, Bituminous Patching/Coating/Surfacing, Directional Drilling, Landscaping (Planting Projects), Sitework/Excavating and Grading, Traffic Control, Excavation, Erosion Control - Temporary The project consists of the construction of directionally drilled force main river crossing under the Mississippi River which includes the following major items: o 0.76 AC Clearing and Grubbing o 825 CY Excavation- Common o 825 CY Common Topsoil Borrow o 1 LS Air Release Manhole o 1 LS Traffic Control o 150 LF 20" Ductile Iron Pipe and Fittings- East Side o 1 LS 30 RC Pipe and Manholes- West Side o 1 LS Bypass Piping, Wet Taps, Line Stops- East Side o 870 LF 24 inch HDPE Forcemain (Horizontal Directional Drill) o 420 LF Sediment Control Log Type Wood Fiber o 1500 LF Silt Fence, Type MS o 0.91 AC Seeding o 4400 SY Rolled Erosion Prevention Category 30 o 1 LS Landscaping- West Side Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. 7.02 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents