Similar Projects
Last Updated 07/22/2020 09:29 AM
Project Title

2020 Gas Collection and Control System (GCCS) Construction

Physical Address View project details and contacts
City, State (County) Toledo, OH   (Lucas County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes drilling and installing both new and replacement wells, abandoning select existing wells, installing associated piping, making completed well connections, installing new air/forcemain, and providing/installing new pumps, wellheads and all necessary fittings. Additional work includes reconfiguring and/or replacing flare control panel, removing and capping extraneous piping associated with the former Co-Generation project and flare stack maintenance.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents