Similar Projects
Well Pump/Piping Install and Treatment System Upgrade - General
Bidding
$180,000 est. value
Woodward, PA 16882

Holly Acres Estates
Renovation, Alteration
Bidding
Erie, PA 16509

WWTP Grey Water Pumps
Post-Bid
Less than $72,000 est. value
Pittsburgh, PA 15222

Sanitary Sump Pump Replacement at Mellon Square Garage
Post-Bid
Pittsburgh, PA 15222

Water Pollution Control Plant and Pump Station Improvements
Results
Jamestown, PA 16134

Fords Corner Area Wastewater System Extension (Contracts 1-2)
Results
Johnstown, PA 15901

Cleaning Out and Plugging Seven (7) Orphan Oil and Gas Wells
Infrastructure
Bidding
$100,000 to $200,000 est. value
PA

Well No. 3 Replacement Well Drilling, Construction, and Aquifer Testing
Infrastructure
Post-Bid
Saltillo, PA

Glannons Pump Station and Force Main Upgrade - General/Mechanical Construction
Results
Allison Park, PA 15101

Well No. 1 Nitrate Removal System Rehabilitation - General/Process Mechanical
Infrastructure, Alteration
Bidding
Lititz, PA

Turbine Pump for Water Treatment Plant
Post-Bid
PA

Middle School Pump Station Upgrade
Results
Conneaut Lake, PA 16316

Pressure Sewer Construction and Grinder Pump Installation
Post-Bid
Grove City, PA

Pump ZEP 6768 Acid Drum PVC Construction
Results
Less than $25,000 est. value
Philadelphia, PA

Complete Pump and Motor Assembly
Infrastructure
Post-Bid
Philadelphia, PA

Last Updated 02/10/2022 11:47 AM
Project Title

PFAS Treatment Facilities - Well Nos. 5, 8 and 11 - General Construction

Physical Address View project details and contacts
City, State (County) Warrington, PA 18976   (Bucks County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,935,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of furnishing, construction and installation of new Granular Activated Carbon adsorption/filtration systems at three locations; construction of Filter Buildings, chlorination equipment, underground and aboveground piping, valves and fittings; demolition of existing facilities; various site improvements including upgrade of existing driveway, erosion and sedimentation controls; and site restoration including grading, seeding, concrete work, curbing and paving. Electrical Construction includes upgrades to existing electrical service; supply and installation of circuit breakers, transfer switches, transformers, motor starters, conduit and wiring, lighting, fans, louvers, heaters, instrumentation; and SCADA system modifications and associated work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents