Similar Projects
Route 23 Corridor Safety Improvments Chester Co
Alteration
Conception
$1,885,730 est. value
Elverson, PA 19520

PA 41 and SR 841 Improvements
Infrastructure
Conception
$5,520,000 est. value
West Grove, PA

Unionville High School Varsity Baseball Field Renovations
Infrastructure
Design
$1,119,173 CJ est. value
Kennett Square, PA 19348

Merlin Rd o/ Pigeon Run
New Construction, Demolition, Alteration
Design
$1,358,000 est. value
Coatesville, PA

Priority B Interceptor Repairs Project
Infrastructure
Bidding
$5,992,830 CJ est. value
West Chester, PA 19380

Construction of Tolling Facility
New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Mont Clare, PA 19453

Civil and Paving Multiple Award Construction Contract
Term Contract
Sub-Bidding
$500,000 CJ est. value
Jacksonville, NC 28547

Bituminous Leveling and Overlay
Post-Bid
Landenberg, PA

2021 Road Projects
Infrastructure
Post-Bid
Landenberg, PA

Great Valley Middle School Site Paving & Wall Restoration Phase 2
Results
$950,000 est. value
Malvern, PA 19355

Chip Seal of Township Roads
Results
Chester Springs, PA 19425

Rail Yard Reconstruction and Bridge Rehabilitation - Coatesville
New Construction, Renovation
Construction
Coatesville, PA

Railroad Infrastructure Rehabilitation - Coatesville
Renovation
Construction
Coatesville, PA

US 322 Paint Creek Bridge
Renovation, Infrastructure
Conception
$1,666,098 est. value
PA

PA 401 and Valley Hill Rd Improvement
Infrastructure
Design
$350,000 est. value
Frazer, PA 19355

Last Updated 07/28/2022 10:09 AM
Project Title

2022 West Pikeland Township Paving Program #1

Physical Address View project details and contacts
City, State (County) Chester Springs, PA 19425   (Chester County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $280,716 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

2022 West Pikeland Township Paving Program #1 for various roads in the Township. A Certified Check or Bid Bond drawn to the order of the West Pikeland Township in the amount equal to Ten percent (10%) of the amount of the Bid must be submitted with the proposal as Bid security. The project involves, but is not limited to: road milling and delivery / placement of Superpave Warm Mix Asphalt Wearing Course, 9.5 mm mix, 2-inch compacted depth for various roads in the township, including base repair. The successful bidder will be required to furnish a one hundred percent (100%) Performance Bond and a one hundred percent (100%) Payment Bond with an eighteen (18) month warranty within ten (10) days of the bid award, executed by a surety authorized to conduct business in the Commonwealth of Pennsylvania. The work in connection with this project constitutes a Public Works by a Public Body under Pennsylvania Prevailing Wage Act. Bidders are advised that prevailing minimum wage rates, promulgated by the Pennsylvania Secretary of Labor, which must be paid to workmen employed on this project, are incorporated in the Contract Documents. Bidders are advised that they must comply with all State anti-kickback regulations pertaining to work associated with this project. West Pikeland Township hereby reserves the right, which is understood and agreed to by all Bidders, to refuse any or all Bids submitted; and also reserves the right to waive any informality in Bids received, but any contract awarded will be to the lowest responsive, responsible Bidder. Except as otherwise provided by law, no Bidder may withdraw his Bid within sixty (60) consecutive calendar days after the actual date of opening thereof. Meredith Lane - From Yellow Springs Road to the Cul-De-Sac - full road width. Approximate length = 1,040'. Approximate road width = 22'. Approximate total area = 3,244 square yards. Base Repair estimate = 890 square yards. Tullamore Circle - From Street Road to the Cul-De-Sac -full road width. Approximate length = 1,497'. Approximate road width = 22'. Approximate total area = 3,592 square yards. Base Repair estimate = 1,293 square yards. Horseshoe Trail - From Highview Road to Messner Road - full road width. Approximate length = 1,764'. Approximate road width = 18'. Approximate total area = 3,528 square yards. Base Repair estimate = 726 square yards. Horseshoe Trail - From Messner Road to Dewees Lane - full road width. Approximate length = 2,643'. Approximate road width = 18'. Approximate total area = 5,345 square yards. Base Repair estimate = 479 square yards Eagle Farms Road - From Byers Road to the West Pikeland / West Vincent Township Line - full road width. Approximate length = 3,244'. Approximate road width = 24'. Approximate total area = 9,126 square yards. Base Repair estimate = 1,846 square yards CLARIFICATION DEADLINE 5/30/2022 2:00 PM

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents