Similar Projects
Shoal Creek - MoPac/Steck Water Quality Ponds Retrofit - 5282.156 - City Of Austin
Alteration
Conception
Less than $695,000 est. value
Austin, TX 78799

Saint David's HealthCare Hospital / Leander
New Construction, Infrastructure - 150,000 SF
Conception
$142,500,000 CJ est. value
Leander, TX 78641

Motto Hotel by Hilton
New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Austin, TX 78701

George Washington Carver Museum Cultural and Genealogy Center Phase 2A Site Utilities
Renovation, Addition, Build-Out, Infrastructure
Design
$5,100,000 est. value
Austin, TX 78702

Waterloo Greenway - Creek Delta
New Construction, Infrastructure
Bidding
$55,000,000 CJ est. value
Austin, TX 78701

Waterloo Greenway - Creek Delta
New Construction, Infrastructure
Bidding
$55,000,000 CJ est. value
Austin, TX 78701

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Street Sweeping
Term Contract
Post-Bid
Pflugerville, TX

Redevelopment of 1215 Red River and 606 East 12th Streets
Results
Austin, TX 78701

Beachside Redevelopment at Galveston Island State Park
New Construction
Results
$11,625,000 to $13,440,000 est. value
Austin, TX 78744

Dutch Bros Coffee - Menchaca Road (TX1201) / Austin
New Construction, Infrastructure - 862 SF
Construction
$500,000 CJ est. value
Austin, TX 78748

1200 Springdale Apartments
New Construction, Infrastructure
Construction
$47,000,000 CJ est. value
Austin, TX 78721

Dutch Bros Coffee TX1202 / Austin
New Construction, Infrastructure - 871 SF
Pending Verification
$250,000 CJ est. value
Austin, TX 78754

Dutch Bros Coffee TX1202 / Austin
New Construction, Infrastructure - 871 SF
Pending Verification
$250,000 CJ est. value
Austin, TX 78754

1418 Frontier Valley Multi-Residential
New Construction, Infrastructure - 69,700 SF
Design
$12,500,000 CJ est. value
Austin, TX 78741

Last Updated 10/10/2022 12:08 PM
Project Title

William Cannon Drive Phase 3

Physical Address View project details and contacts
City, State (County) Austin, TX 78745   (Travis County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2021
Bids Due View project details and contacts
Estimated Value $370,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of an arterial road and associated infrastructure including grading, roadway, bridge, storm sewer, water quality, landscaping, sidewalks, and erosion controls. This section describes the Project in general and provides an overview of the extent of the Work to be performed by the CONTRACTOR. Detailed requirements and extent of Work is stated in the applicable Specification Sections and shown on the Drawings. CONTRACTOR shall, except as otherwise specifically stated herein or in any applicable part of these Contract Documents, provide and pay for all labor, materials, equipment, tools, construction equipment, and other facilities and services necessary for proper execution, testing, and completion of the Work. Any part or item of the Work which is reasonably implied or normally required to make the installation satisfactorily operable shall be performed by the CONTRACTOR and the expense thereof shall be included in the applicable unit prices or lump sum prices bid for the Work. It is the intent of these Specifications to provide the OWNER with the complete system. All miscellaneous appurtenances and other items of Work that are incidental to meeting the intent of the Specifications shall be considered as having been included in the applicable unit prices or lump sum prices bid for the Work even though these appurtenances and items may not be specifically called for in the Bid Documents. The Work shall include furnishing all tools, labor, materials, equipment, and miscellaneous items necessary for the complete construction of William Cannon Drive Phase 3, as shown on the plans, regardless of quantities and units as may be reflected in the bid proposal form. The Project is located from a starting point at Cardinal Bloom Loop (approximately 1520 feet east of the intersection of William Cannon Drive and McKinney Falls Parkway) and extending east approximately 1 3/4 -mi. to the stub-out of the west bound lanes constructed under William Cannon Drive Phase 2 (approximately 400 feet west of U.S. Highway 183) in Travis County, Texas. Carma Easton LLC ("Owner") on behalf of Pilot Knob Municipal Utility District No. 1 (the "District") and Travis County, Texasisrequesting sealed written Bidsfor furnishing all labor, materials, equipment,supervision, and incidentals, and for performing all Work required for William Cannon Drive Phase 3 (the "Project") located at a starting point of Cardinal Bloom Loop (approximately 1520 feet east of the intersection of William Cannon Drive and McKinney Falls Parkway) and extending east approximately 1 3/4 -mi. to the stub-out of the west bound lanes constructed under William Cannon Drive Phase 2 (approximately 400 feet west of U.S. Highway 183) in Travis County, Texas. The Project consists of the following: construction of an arterial road and associated infrastructure including grading, roadway, bridge, storm sewer, water quality, landscaping, sidewalks, and erosion controls.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents