Similar Projects
RFQ - Energy Assessments and Professional Services
Term Contract
Conception
Eureka, CA 95501

RFP - Humboldt Regional Climate Action Plan (CAP) Environmental Impact Report (EIR)
Term Contract
Bidding
Eureka, CA 95501

RFQ/P Engineering - Engineering Design and Construction Management Services for the Arcata Ball Park Improvement Project
Infrastructure
Bidding
$200,000 CJ est. value
Arcata, CA 95521

RFQ - Comprehensive Long-Term Environmental Action navy (C.L.E.A.N.) V Indefinite Delivery/Indefinite Quantity contract for Architect-Engineer (A-E) services
Term Contract
Post-Bid
$240,000,000 CJ est. value
San Diego, CA 92132

A-E IDIQ Surveying and Mapping
New Construction, Term Contract
Post-Bid
$10,000,000 est. value

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

Cultural and Environmental MATOC
Term Contract
Post-Bid

C1da--Visn 21 Design A/E IDIQ 2022-2027
New Construction
Post-Bid

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Post-Bid
Less than $98,000,000 est. value

AE On Call Roadway Construction Services For District 1
Infrastructure
Post-Bid

Redwood Marine Multipurpose Terminal Replacement Project
Term Contract
Post-Bid

Architectural and Engineering Professional Services
Term Contract
Post-Bid
$50,000 to $100,000 est. value

Test Water Samples for Mojave National Preserve
Term Contract
Post-Bid

Design - Student Residence Halls
New Construction, Alteration
Post-Bid
$1,300,000 est. value
Eureka, CA 95501

Redwood Park Improvements Project - City of Arcata
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Arcata, CA 95521

Last Updated 06/20/2023 07:02 PM
Project Title

Plunkett Road Waterline Retrofit Project Phases 2 and 3 - City of Arcata

Physical Address View project details and contacts
City, State (County) Bayside, CA 95524   (Humboldt County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected August 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $1,830,100 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Per the owner, as of June 20, 2023, they only received one proposal for this solicitation and the cost far exceeded the available budget for the project, therefore the city elected to complete the design portion of the project in-house. The owner states that it is anticipated that the project will be advertised for bids in early 2024 with construction in the summer of 2024. Closed solicitation has been included below for reference. .................... The City of Arcata is seeking a qualified consulting firm to provide engineering services for developing final Plans, Specifications and Estimates (PS&E) for Phase 2 of the Plunkett Road Waterline Retrofit Project, with the option to award a separate contract for Construction Management (Phase 3) at a later time. The City was awarded funding to complete the Project through FEMAs Hazard Mitigation Grant Program, administered by Cal OES. The selected consultant must adhere to both federal and state requirements related to the HMGP. Phase Two of the Project will involve preparing bid-ready construction PS&E at the 60%, 90% and 100% levels. Phase 2 also involves finalizing necessary geotechnical investigations and environmental permitting. Phase 3 of the Project will involve all aspects of construction management for the project. An optional job walk will be held on February 23, 2023, at 2:00 p.m., beginning from Arcata City Hall, 736 F Street in Arcata. Sealed proposals for this work will be received at the City Managers Office, 736 F Street, Arcata, California, until 4:00 p.m. on Friday, March 10, 2023. The proposals submitted in response to this RFP will be evaluated and used as a basis for selecting a consultant for this phase of the project, with the option to award additional project phases. The DBE goal for this project is 5%. Questions received after the deadline of 5 p.m. on March 2, 2023, may not be answered. The Method of Contractor selection has not been determined at this time

Details

Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents