Similar Projects
Moravian Creek Emergency Repairs
Alteration
Design
$500,000 to $1,000,000 est. value
Wilkesboro, NC

Hangar Site Development and Parking Lot Expansion
Demolition, Infrastructure, Alteration
Bidding
$4,445,852 est. value
Smithfield, NC 27577

Grading, Drainage, and Paving
Infrastructure
Bidding
$5,000,000 est. value
NC

CAPE Emerald Subdivision Pond Outlet Structure and Pipe Relocation
Post-Bid
Emerald Isle, NC 28594

Willow Pond Stream Restoration
Post-Bid
Cornelius, NC 28031

Historic Courthouse Drainage and Waterproofing
Results
Statesville, NC 28677

DPS - Rockingham Youth Development Center- Grading and Utilities
Results
Rockingham, NC 28379

Grading, Drainage and Paving at US-301/NC-242
Infrastructure
Bidding
$2,000,000 est. value
NC

Pebble Creek Stream Stabilization Project
Post-Bid
Asheville, NC 28801

Swann Intake Bank Stabilization Project
Results
Winston-Salem, NC

Corrugated Aluminized Pipe
Post-Bid
Polkton, NC 28135

Watershed Restoration Project - Phase 2
Results
Less than $89,396 est. value
Jacksonville, NC

Corrugated Polyethylene Pipe
Post-Bid
Nashville, NC 27856

Stormwater Drainage Assistance Program - Bundle Project 3
Results
Less than $381,000 est. value
Raleigh, NC 27612

Sierra Drive Drainage Improvements
Post-Bid
Raleigh, NC 27603

Last Updated 04/26/2022 12:29 AM
Project Title

North Main Streambank Stabilization And Sidewalk Repair

Physical Address View project details and contacts
City, State (County) Hendersonville, NC   (Henderson County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

North Main St. Streambank stabilization includes but is not limited to: mobilization, stabilization of approximately 40 linear feet of eroding streambank using bioengineering methods, removal of existing material and debris, grading, installation of new RCP pipe, tie-in to existing stormwater pipe, replacement and repair of existing sidewalks as described in Bid Schedule. The contractor shall be responsible for all State and local permits and Call Before You Dig matters. The contractor will provide all necessary traffic control signs, cones, etc. and provide flagmen as needed. The contractor is also responsible for notifying businesses and residences within each work zone of the construction schedule and of any changes to that schedule.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents