Similar Projects
1120 & 1130 N State
Demolition, New Construction, Infrastructure - 10,000 SF
Design
$50,000,000 CJ est. value
Chicago, IL 60610

Bally's Casino / Chicago
LEED Certification, New Construction, Infrastructure
Design
$1,700,000,000 CJ est. value
Chicago, IL 60654

DMDF Vertical Expansion Project Front Ends
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Chicago, IL 60604

1300 Carroll - Phase 1
LEED Certification, New Construction, Infrastructure - 787,807 SF
Post-Bid
$155,000,000 CJ est. value
Chicago, IL 60607

Burley ES - LBP Mitigation and ACM Patch & Repair in the Ventilation System
Term Contract, Infrastructure
Results
$29,725 CJ est. value
Chicago, IL 60657

McCook and Thornton Reservoirs Rock Wall Stabilization and Geotechnical Instrumentation
Renovation
Results
$8,460,000 to $10,250,000 est. value
Bedford Park, IL 60501

Lake Street Office
New Construction, Infrastructure - 67,600 SF
Construction
$16,600,000 CJ est. value
Chicago, IL 60607

St. Alexius Medical Center Addition
Addition, Infrastructure, Renovation - 29,000 SF
Construction
$14,000,000 CJ est. value
Hoffman Estates, IL 60169

Dialysis Care Center Western
New Construction, Infrastructure
Pending Verification
$600,000 CJ est. value
Chicago, IL 60620

Halsted Street Mixed-Use Development
New Construction, Infrastructure - 4,000 SF
Pending Verification
$2,000,000 CJ est. value
Chicago, IL 60614

London Crossing
New Construction, Infrastructure - 32,600 SF
Design
$11,000,000 CJ est. value
Wheeling, IL 60090

Site Improvements at Misty Meadows Park
Infrastructure
Post-Bid
Palos Heights, IL

Northwest Wheeling CNG Bus Maintenance & Storage Facility
New Construction
Results
$40,000,000 est. value
Wheeling, IL 60090

210 N Aberdeen Mixed-Use
New Construction, Infrastructure - 10,700 SF
Construction
$140,000,000 CJ est. value
Chicago, IL 60607

North Rush Street Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$1,900,000 CJ est. value
Chicago, IL 60611

Last Updated 06/20/2023 05:31 AM
Project Title

MWRD Phosphorus Removal Modifications to Battery D O'Brien Water Reclamation Plant

Physical Address View project details and contacts
City, State (County) Skokie, IL 60076   (Cook County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $14,850,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of Conversion of Aeration Tank No. 1 to a Fermenter Tank, Construction of a RAS Pump Building, Installation of Fermented Sludge Pumps, Modification of Aeration Tanks No. 2 through 8, Installation of all other infrastructure required. (see attached scope of work). The estimated cost of the work under Contract 21-091-3P is between $16,638,205.00 and $20,140,985.00. Trades included but not limited to: Shoring, Sheeting, & Bracing, Demolition, Site Clearing, Earthwork, Drilled Concrete Piers & Shafts (Caissons), Site Utility Systems, Steam Distribution, Erosion & Sediment Control, Concrete Pavement, Site Concrete, Landscaping, Concrete Formwork, Accessories, & Reinforcement, Cast-In-Place Concrete, Concrete Curing, Grout, Masonry, Structural Steel, Steel Decking, Metal Fabrications, Pipe & Tube Railings, Stainless Steel Handrails, Railings & Guardrails, Rough Carpentry, Insulation, Roofing, Fireproofing, Firestopping, Joint Sealants, FRP Doors & Frames, Overhead Coiling Doors, Glazing, Painting, Signage, Fire Extinguishers, Stainless Steel Sliding Gate, Pumps & Appurtenances, Vertical Wet Pit Solids Handling Pumps & Appurtenances, Submersible Mixers, FRP Plank Baffle Wall System, Control System, Instruments, Hoisting Equipment, Portabel Cranes, HVAC, & Electrical. A. Scope includes work briefly described herein and other work shown or described in the contract documents to complete the project: 1. Conversion of Aeration Tank No. 1 to a Fermenter Tank, including the following: a. Eight (8) submersible propeller mixers equipped with VFDs in the tank. b. Portable davit cranes for removal of mixers. 2. Construction of a RAS Pump Building, including the following: a. 24-in diameter influent line connected to the Return Sludge Conduit. b. Three (3) Vertical Turbine Solids Handling Pumps, equipped with VFDs, each with a capacity of 2,780 gpm. c. 20-in diameter line with discharges to the Fermenter Tank. d. Monorail and trolley/hoist for removing the pumps. e. Pump and Electrical Rooms. 3. Installation of Fermented Sludge Pumps, including the following: a. Three (3) Submersible Solids Handling Pumps, equipped with VFDs, each with a capacity of 2,780 gpm. b. 12-in diameter lines for each pump which discharge to the Mixing Channel. c. Portable davit cranes for removal of pumps. 4. Modification of Aeration Tanks No. 2 through 8, including the following: a. Three (3) constant speed submersible propeller mixers in each tank (total of 21). b. Three (3) baffle walls in each tank (total of 21) to separate the treatment zones. c. Portable davit cranes for removal of mixers. 5. Installation of all other infrastructure required, including the following: a. Yard piping, site pavement, and all other Civil work required for the new facilities. b. Structural, Architectural, HVAC, and Plumbing work required for the new RAS Pump Station Building. c. Electrical and I&C work required to power and control all process and HVAC, including a ductbank carrying wiring and conduit to the new facilities from the existing Process Control Building and integration of the installed systems into the existing plant DCS system. MBE (20%), WBE (9%), DVBE (3%)

Details

1 Story Above Grade, 2,250 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents