Similar Projects
Automation of Fiber Line at Boulder County Recycling Center - BCRC
Bidding
CO

On-Call Directional Boring
Bidding
CO

Kiln Room Mitigation
Post-Bid
CO

MV DIST - 30th & Colorado Relocation
Post-Bid
Less than $650,000 est. value
Boulder, CO

Uninterruptible Power Supply (UPS) Maintenance
Results
Boulder, CO

LED Stage Lighting
Results
$30,000 to $35,000 est. value
Boulder, CO

Building 1 Circuit Breaker Replacement
Bidding
Boulder, CO 80305

Maintenance and Support for Eaton UPS and Cellwatch Systems
Post-Bid
Boulder, CO

Purchase of 2 UPS Units and Equipment Including Install, Testing and Programming
Results
Broomfield, CO 80020

District Wide Generator Maintenance
Post-Bid
Longmont, CO 80503

Dilution Refrigerator Helium Battery System
Results
Boulder, CO 80305

Louisville Utilities Electrical Assessment
Post-Bid
Louisville, CO 80027

Electrical Contractors
Results
Less than $1,000,000 est. value
Longmont, CO 80503

WVHP Electrical Upgrade Project
Post-Bid
Less than $1,300,000 est. value
Boulder, CO 80303

Data Center UPS Replacement
Results
$40,000 to $50,000 est. value
Boulder, CO

Reported 09/04/2020 12:00 AM
Project Title

Install CSMS Emergency Generator

Physical Address View project details and contacts
City, State (County) Longmont, CO 80112   (Boulder County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Design-Build. Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $400,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Install an emergency generator at the Combined Support Maintenance Shop (CSMS) Firestone Facility in Longmont CO. The project consists of replacing the existing standby generator with a new, 450kW diesel standby generator with skidmounted fuel tank. The new generator shall be placed within a level II, sound-attenuated, weatherproof enclosure. In addition, a new automatic transfer switch, service entrance switchboard and associated conduit/conductors shall be installed. A new, structural concrete pad shall be poured for the generator foundation and new generator exhaust piping shall be installed

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents