Similar Projects
Rehabilitation of Pumps and Motors
Infrastructure
Bidding
$500,000 est. value
Evansville, IN 47713

Raw Water Supply Pump Procurement
Infrastructure
Bidding
Fort Wayne, IN 46895

Monroe WTP Residuals Pumping Improvements
Post-Bid
Bloomington, IN 47401

NFPA Approved 1500 GPM Fire Well
Post-Bid
Granger, IN 46530

Wastewater Treatment Plant Improvements
Results
Bedford, IN 47421

Wastewater System Improvements and Septic Relief
Results
Huntington, IN 46750

Water System Improvements
Infrastructure
Bidding
Dana, IN

Grit Dewatering Improvements
Post-Bid
Gary, IN 46401

WWTP Clarifier Rehabilitation
New Construction, Demolition
Results
South Bend, IN 46601

Virgin Granular Activated Carbon
Post-Bid
Hammond, IN

Water System Improvements
New Construction, Demolition
Results
Newport, IN 47966

Jasper Regional Water District (NORWEJ) Water Supply and Treatment Plant No. 2
Post-Bid
DeMotte, IN 46310

Water Pollution Control Plant Trim Blower Improvements
Results
Fort Wayne, IN

Indiana Harbor and Canal Confined Disposal Facility Wastewater Treatment Plant
Post-Bid
$1,000,000 to $5,000,000 est. value
East Chicago, IN 46394

WPCP Dechlorination Injection Improvements
Results
Fort Wayne, IN 46803

Last Updated 08/10/2021 01:32 PM
Project Title

New Water Treatment Plant and Well No. 5

Physical Address View project details and contacts
City, State (County) Lagrange, IN 46761   (Lagrange County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This work involves the construction of a new one (1.0) MGD (Firm) water treatment plant, well houses, two (2) 0.5 MG storage tanks, site piping, site improvements, and additional renovation work within the two (2) existing well houses. The site improvements include a parking area, drives, landscaping, storm management, utilities, and other associated components. The building is a single-story structure with a partial mezzanine and a partial equipment platform. It includes pre-engineered metal building framing and load-bearing masonry construction on concrete foundations and spread footings. The interior includes masonry walls, metal liner panel, and metal stud partitions, with associated finishes. The exterior is metal siding and insulated, decorative-faced CMU, with a standing seam metal roofing. The project includes site/civil, architecture, structural, process, mechanical, plumbing, and electrical systems. The new well house construction includes load-bearing masonry construction on concrete foundations and spread footings, with a brick veneer exterior wall system and an EPDM roof membrane.

Details

Division 02 - Existing Conditions, Subsurface Investigation, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents