Similar Projects
Hvac & Electrical Contractors
Post-Bid

Hvac & Electrical Contractors
Post-Bid

Back-up HVAC System for Server Room
Results
Charleston, SC 29415

5 Ton Leibert Split System Replacement
Results
Charleston, SC 29412

Kitchen Hood and Fire Suppression System Inspections
Post-Bid
Summerville, SC 29483

Air Conditioning Addition for Sodium Hypochlorite Generation Room
Results
$191,000 to $236,000 est. value
Greenwood, SC

SRRC Air Compressor Maintenance, Repair/Replace
Post-Bid
Aiken, SC 29803

Provide and Deliver Daikin 1.0-Ton Wall Mounted Heat Pump Systems
Results
Less than $16,223 est. value
Greenwood, SC

Housing HVAC Upgrades
Post-Bid
$100,000 to $150,000 est. value
Charleston, SC

HVAC Maintenance and Repair Services
Term Contract
Results
Columbia, SC

SEI Air Handlers 1-6 Replacement
Post-Bid
$575,000 to $625,000 est. value
Charleston, SC 29425

Term Contract for Mechanical HVAC Services
Term Contract
Results
SC

EMS Replacement Heat Pumps
Post-Bid
Orangeburg, SC 29115

Energy Savings Performance Services
Term Contract
Results
Columbia, Eastover, Hopkins, SC 29209

Hollings Cancer Center 2nd Floor Pharmacy HVAC Installation
Post-Bid
$100,000 to $250,000 est. value
Charleston, SC 29425

Last Updated 05/18/2020 12:23 PM
Project Title

Glen Arden Elementary School Roof Mounted Package Replacement

Physical Address View project details and contacts
City, State (County) Arden, NC 28704   (Buncombe County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of the (2) electric package units and replace with new gas fired package units. The 7-1/2-ton unit design is based on the carrier model 48HCRE08K3M6-2F2C0. The 28-ton unit is based on the carrier model 48HCRE28KCM6-2F2C0. 1. Remove the (2) existing electric roof mounted units. 2. Install metal curb adaptors. 3. Install new replacement units as specified with BACnet capability. 4. Extend and properly size metal gas piping to accommodate new units. Pipes shall be painted yellow and labeled) Valves shall be included. 5. All wiring, accessories and disconnects shall be replaced and included. 6. All low voltage wiring shall be in conduit. 7. DDC controls shall be performed by Trane. (Fred VanAller 828 337-4297)

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents