Similar Projects
Office & Training Building
New Construction
Conception
Houston, TX 77002

Levit Green
New Construction
Conception
Houston, TX

Houston Endowment
New Construction - 40,000 SF
Design
$20,000,000 est. value
Houston, TX 77007

Exxon Mobil Webster Station
New Construction - 4,500 SF
Design
$1,800,000 est. value
Webster, TX 77598

East Aldine Management District Office Building and Town Center Park
Post-Bid
Houston, TX

Highland Village End Cap
New Construction - 40,312 SF
Post-Bid
$3,000,000 est. value
Houston, TX 77027

Marwaha Group
Renovation - 8,244 SF
Results
$100,000 est. value
Houston, TX 77073

Build - Out of the Cypress Hill Tax Office for Harris County
Build-Out
Results
Less than $1,325,000 est. value
Houston, TX 77002

Park 249 Building Complex
New Construction
Construction
Houston, TX 77064

Southside Commons
Renovation - 80,000 SF
Construction
$8,000,000 est. value
Houston, TX 77025

Honeywell Rebellion Office
Renovation
Pending Verification
$862,486 est. value
Houston, TX 77042

Levit Green - Phase 1
New Construction - 270,000 SF
Pending Verification
$10,000,000 CJ est. value
Houston, TX 77021

Compass
Build-Out
Conception
Houston, TX 77008

Jestex Warehouse
Addition - 4,200 SF
Design
$1,000,000 est. value
Houston, TX 77012

Asian City Plaza
New Construction - 157,437 SF
Post-Bid
$15,000,000 est. value
Houston, TX 77072

Last Updated 10/16/2020 04:04 PM
Project Title

Addicks and Barker Project Office Building Construction

Physical Address View project details and contacts
City, State (County) Houston, TX 77077   (Harris County)
Category(s) Commercial
Sub-Category(s) Office
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Original Set Aside: 8(a) Set-Aside - Construct a single story 7,592 sq. ft. Addicks & Barker Project Office and additional compound features. Project Office building will double as an EOC Coop site. Compound can include, but is not limited to, a maintenance shop (2125 sq. ft), a gravel parking pad/laydown area, a gravel road to Noble Road, parking lot, and location of the new portable HazMat building. Work includes site construction, plumbing, electrical, masonry, HVAC, and additional work related to vertical construction.

Details

1 Office, 1 Story Above Grade, 7,592 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents