Similar Projects
Cooling Plant #1 Tower Replacement Phase 4
Renovation
Sub-Bidding
$400,000 CJ est. value
Lexington, KY 40508

Parking Structure - 8 Rooftop Unit Replacement
Renovation
Sub-Bidding
$200,000 CJ est. value
Lexington, KY 40508

Split System and Rooftop A/C Replacement
Alteration
Post-Bid
Louisville, KY 40212

Custom Air Handling Unit
Renovation
Post-Bid
$800,000 CJ est. value
Lexington, KY 40508

UKHC PAV H - Replace AHU S1 and S1A - BP-02 Trades - Trade Package 5 - Fire Suppression
New Construction, Infrastructure
Results
Lexington, KY 40508

PAV WH Replace AHU 4 and 5 - 2553.0
Infrastructure
Results
$1,425,000 est. value
Lexington, KY

Asset Preservation - Central Heating Deaerator Tank
Renovation
Sub-Bidding
$432,000 CJ est. value
Lexington, KY 40508

Construction to Upgrade Chiller Plant
Renovation
Post-Bid
$5,000,000 CJ est. value
Lexington, KY 40511

Town Branch Scum Facility Improvements
Renovation, Alteration
Results
Lexington, KY 40504

HVAC Repair
Term Contract
Post-Bid
Lexington, KY 40508

Cooling Plant 1 Tower Replacement - Phase III
Alteration
Results
Lexington, KY 40502

Whitaker Family YMCA Swimming Pool HVAC Replacement
Build-out
Post-Bid
$1,500,000 CJ est. value
Lexington, KY 40509

Blue Grass Airport - Boiler Room 1 - Chiller Replacement - 2112
Alteration
Results
$275,000 est. value
Lexington, KY

Chemistry Physics Building - Heat Exchange
Renovation
Post-Bid
Lexington, KY 40508

Fine Arts Building Elevator Modernization
Renovation
Results
Lexington, KY 40508

Last Updated 02/28/2023 02:27 PM
Project Title

Refrigeration and Cooling System Services

Physical Address View project details and contacts
City, State (County) Lexington, KY 40508   (Fayette County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

A/C Units/Refrigerated Coolers/Air Curtains and related equipment 1) Computer room AC unit 2) Refrigerated Coolers (6 kitchen coolers, 1 Aux cooler) 3) Air Curtains (loading dock) 4) Includes any related equipment and includes annual service. Annual service is considered to be the minimum service for cleaning coils and checking pressures and protection devices for the units and will include cleaning all indoor and outdoor coils as necessary to ensure proper operation, inspection for any anomalies should be performed every 3-4 months to protect the division equipment and ensure efficient operation. 5) The successful contractor will be responsible for all parts and labor in order to keep the equipment in proper working order. Question Cuttoff Date & Time 2/20/2023 12:00:00 PM (ET)

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents