Similar Projects
Maple Lane Resurfacing - 14 Mile Road to Volpe - City of Sterling Heights
Infrastructure, Alteration
Conception
$1,800,000 est. value
Sterling Heights, MI 48312

Emerald Creek Site Condos
New Construction, Infrastructure
Conception
$20,000,000 CJ est. value
Shelby Township, MI 48315

American Muslim Diversity Association
Addition, Demolition, Infrastructure - 13,348 SF
Design
$4,300,000 CJ est. value
Sterling Heights, MI 48314

Speedway Gas Station and Convenience Store / Shelby Township
New Construction, Infrastructure - 4,608 SF
Design
$1,400,000 CJ est. value
Shelby Township, MI 48317

Take 5 Oil Change / Warren
New Construction, Infrastructure - 1,430 SF
Post-Bid
$420,000 CJ est. value
Warren, MI 48093

2022 Sidewalk Replacement Program
Alteration
Post-Bid
Chesterfield, MI

Bundle 3 Rest Area Ada Eastern Lower Peninsula - Interior
Results

Transportation Building Site Renovations Project
Infrastructure
Results
Warren, MI 48089

Circle A
Demolition, New Construction, Infrastructure, Renovation - 3,612 SF
Pending Verification
$1,500,000 CJ est. value
Sterling Heights, MI 48310

Jefferson Avenue Office
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
St Clr Shores, MI 48080

Construction Manager / General Contractor (CM/GC) Service
Infrastructure
Design
$300,000 CJ est. value
Lenox, MI 48050

Metropolitan Parkway, Dequindre Road to Ryan Road Intersection Pavement Rehabilitation
Infrastructure
Post-Bid
MI

Ray Township Offices Auxiliary Parking Lot
Infrastructure
Results
Ray, MI

Graphex Michigan I Processing Plant at Emerald Business Park
New Construction, Infrastructure - 150,000 SF
Pending Verification
$75,000,000 CJ est. value
Warren, MI 48089

GFA Long Lake Multifamily Development
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Sterling Heights, MI 48314

Last Updated 03/27/2023 05:14 AM
Project Title

Boardwalk Decking Replacement Phase II

Physical Address View project details and contacts
City, State (County) Harrison Township, MI 48045   (Macomb County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $358,600 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of January 20, 2023, the project was awarded to Oak Construction for $358,600. Anticipated start in mid to late February. Job Location Lake St. Clair Metropark Questions are submitted online No The work includes furnishing all labor, equipment and materials necessary to complete the work including partial removal and replacement of existing boardwalk decking, removal and replacement of additional wooden boardwalk material, and all incidental construction at Lake St Clair Metropark in Macomb County, Michigan. General Requirements - Installation Required - Insurance Required

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents