Similar Projects
Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

General Maintenance Contractor Service
Infrastructure
Post-Bid
Ignacio, CO

County Road 509 Siphon Replacement Project
Results
Durango, CO 81301

Airport North and South General Aviation Apron Pavement Maintenance
Results
Durango, CO 81301

CR 210 Paving Overlay Project
Results
Durango, CO 81301

Centerra Parcel 301 Public Infrastructure
Results
$1,000,000 to $1,500,000 est. value

Replacing and Patching Damaged Concrete Pavement
Results
$5,000,000 to $20,000,000 est. value

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Kinston Residential Phase 1B Public Infrastructure
Results
$1,500,000 to $2,000,000 est. value

County Road 234 Paving Overlay
Results
Durango, CO

Eight Corners Intersection Repair
Results
Less than $92,452 est. value
Bayfield, CO

Reconstruction of City Streets at Various Locations
Results
Durango, CO

Milling and Overlay of Various City Streets Project
Results
Durango, CO

Reconstruction of City Alleys at Various Locations
Results
Durango, CO

Application Open Graded Friction Course (OGFC) to Various City Streets
Results
Durango, CO

Last Updated 01/14/2022 10:56 AM
Project Title

County Road 203 Paving and Overlay

Physical Address View project details and contacts
City, State (County) Durango, CO   (La Plata County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed project consists of the construction of a new asphalt pavement surface on County Road 203 from the south intersection at State Highway 550 to the north intersection at State Highway 550. The work scope for this Project shall include an asphalt overlay of approximately 6.8 miles of roadway on County Road 203 (Refer to the bid schedule for actual bid quantities). The 4 inches of total asphalt is comprised of a leveling course and a second mat. Milling will be for pavement tie-ins only. The existing road width varies from 23 to 25 feet.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents