Similar Projects
Epperson North Village B
Infrastructure
Design
$1,000,000 CJ est. value
Wesley Chapel, FL 33543

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Milling and Resurfacing
Infrastructure
Bidding
$4,352,338 CJ est. value
Spring Hill, FL 34610

District-Wide Maintenance of Continuous Deflective Separation (CDS) Units
Infrastructure
Post-Bid

RFP - SR54 fr Gunn Hwy to E of Crossing Blvd
Infrastructure
Post-Bid
$16,517,093 CJ est. value
Land O Lakes, FL 34638

Lacoochee Industrial Area Right-of-Way Improvements Segments 1 and 2
Infrastructure
Results
$2,163,898 CJ est. value
Lacoochee, FL 33523

Roadway Rehabilitation and Repaving
Infrastructure
Results
$20,831,248 CJ est. value
New Port Richey, FL 34652

Suncoast Parkway 2 Phase 3A - Florida Department of Transportation
Infrastructure
Pending Verification
$100,000,000 CJ est. value
Spring Hill, FL 34610

Suncoast Parkway 2 Phase 3B - Florida Department of Transportation
Infrastructure
Pending Verification
$100,000,000 CJ est. value
Spring Hill, FL 34610

New Port Richey Parks and Recreation Main St. Signature Entry Feature
Infrastructure
Bidding
$2,000,000 CJ est. value
New Port Richey, FL 34652

RFP Engineering - Suncoast Connector PD and E/Design - A
Infrastructure, Renovation
Post-Bid
$40,000,000 CJ est. value
Land O Lakes, FL 34639

Old Dixie Highway Driveway and Ditch Repairs
Infrastructure
Results
$193,045 CJ est. value
Dade City, FL 33525

RFP D/B - SR 52 Resurface and Roundabout
Infrastructure
Bidding
$7,435,320 CJ est. value
Land O Lakes, FL 34637

New Port Richey Fire Station No. 2
New Construction, Infrastructure - 7,876 SF
Post-Bid
$3,905,242 CJ est. value
New Port Richey, FL 34652

RFP D/B - SR 54/SR 56 From CR 587 (Gunn Highway) to CR 581 (Bruce B. Downs Boulevard) - Advanced Traffic Management System (ATMS), Pasco County
Infrastructure
Post-Bid
$1,070,480 CJ est. value
Wesley Chapel, FL 33544

Last Updated 03/02/2023 05:03 AM
Project Title

District-wide Landscape Maintenance

Physical Address View project details and contacts
City, State (County) Land O Lakes, FL 34637   (Pasco County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $2,365,353 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Counties: Dist/St-Wide Road Name : Districtwide Landscape Maintenance Limits : Midpoint Project(S): 41602617282(*) Federal Aid No: N/a Total Roadway Length: 0.000 Miles Contract Days: 365 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: 10 Special Start Date: N/a The work under this Contract consists of District 7 Districtwide Landscape Maintenance. The quantities shown on the Bid Price Proposal are approximate and only represent estimated planned requirements based on historical or specific project needs. The Department does not guarantee any maximum or minimum quantity, any range of quantities, or the exact quantities shown for each bid item. The Department's estimated quantities and the Contractor's bid price will be used to calculate a total bid amount. This total bid amount will then be used to determine the low bidder; however, actual payment under the awarded contract will be based on actual quantities completed. For this Contract in which specific sites are not identified at the time of letting, the Engineer will issue a Work Document. Work Documents will identify the location, description, amount of work to be accomplished, and the number of calendar days to complete the work. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 003 Mowing, Litter Removal, Edging

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents