Similar Projects
Innsbrook Urban Mixed-Use
New Construction
Conception
Henrico, VA

Innsbrook Urban Mixed-Use
New Construction
Conception
Henrico, VA

GreenCity
New Construction - 2,497,000 SF
Design
$2,300,000,000 est. value
Richmond, VA

Walmart Supercenter #1523-247 - Smart Bundle
Renovation - 192,256 SF
Design
Glen Allen, VA

Bath & Body Works #2706 - Creeks at Virginia Center / Glen Allen
Renovation
Bidding
$150,000 CJ est. value
Glen Allen, VA 23059

Walmart 0-2--TENANTBID--2021 - Bundle #2
Renovation
Post-Bid

Elko Hub Communication Shelter Relocation
Infrastructure
Post-Bid
VA

Annual Contract for Easement Clearing
Term Contract
Results
VA

Subgrade Stabilization
Infrastructure
Results

Metropolis at Innsbrook
New Construction - 28,000 SF
Construction
$83,000,000 est. value
Richmond, VA

Laurel Park
New Construction, Demolition - 12,000 SF
Construction
Richmond, VA 23228

Henrico Corporate Headquarters Redevelopment
Renovation, Addition
Pending Verification
Richmond, VA 23230

Multifamily Development And Townhouses
New Construction
Pending Verification
Richmond, VA 23223

Green City Development
New Construction - 1,585,000 SF
Conception
Henrico, VA

Walmart Supercenter #7032-276 - Smart Bundle
Renovation - 187,277 SF
Design
Henrico, Richmond, VA 23223

Last Updated 08/02/2022 07:02 AM
Project Title

PRESS - John Rolfe Mews - Main Street Homes

Physical Address View project details and contacts
City, State (County) Richmond, VA 23250   (Henrico County)
Category(s) Commercial, Heavy and Highway, Residential
Sub-Category(s) Multi-Family Homes, Retail, Site Development
Contracting Method Bids by Invitation
Project Status
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Less than a year after scrapping a previous proposal that called for more than 200 apartments, the owner of a tract at a prominent Henrico crossroads has come back with a new plan -- and a homebuilder on board. Rebkee Co. is working with Main Street Homes on a reworked development for the 8-acre site at the convergence of John Rolfe Parkway and Pump and Church roads. Called John Rolfe Mews, the new proposal calls for 81 townhomes and 6,000 to 8,000 square feet of commercial space. That's compared to the 225 apartments and 18,500 square feet of commercial that Rebkee had previously proposed as a project called The Shire. Pushback to The Shire prompted Rebkee to scrap it last summer, with principal Rob Hargett saying he would rework it. In the time since, he reached out to Main Street Homes, a Midlothian-based builder that Rebkee worked with on another townhome development, Winterfield Park. "We changed the plan after feedback from the neighbors," Hargett said. "I didn't get a lot of love for the last one. So, we went back to the drawing board, we listened to them and we brought back something we thought they wanted." Hargett said comments received in a virtual public meeting for the project last month were complimentary about the new plan. "The folks that (participated) were glad we listened. We feel like we answered their concerns and came up with a better product," he said. Rebkee and Main Street are seeking a rezoning and provisional-use permit from Henrico County to allow for the development. While county planners note the proposal is inconsistent with Henrico's future land use plan, which calls for commercial development for the site, they do support the proposal, describing it as "a logical expansion" of townhome developments that have risen around it. The firms are working with Hirschler attorney Jeff Geiger in the application process. The case is scheduled to go before the county Planning Commission on May 13. Kay Pangraze, land acquisition manager for Main Street, said the townhome units would vary between three and four levels, with 45 three-level units facing out toward Church Road and John Rolfe Parkway, and the remaining four-level units on the interior of the site. She said prices for the units have not been determined but would be comparable to price points in the area. Units would include two-car garages, and Pangraze said outdoor spaces would be worked into the development. Unit sizes were not provided. Plans also call for a plaza at the corner of Church and John Rolfe. A holdover from The Shire, the plaza would be designed as a community gathering space and would add to other amenities including sidewalks, landscaping and food truck stations. Pangraze said a development cost has not been determined. Main Street is under contract to purchase its portion of the site, with Rebkee to develop the scaled-down commercial portion. Hargett said that space could accommodate something like a daycare user or be subdivided for multiple tenants. "To me it feels like a daycare site," he said. "We'll just have to see who shows up, because I don't think there's a whole lot of commercial going up outside of baby daycares right now, because there's so many residential units being built everywhere."

Details

Apartments, 81 Unit(s). 8,000 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents