Similar Projects
Last Updated | 08/11/2022 09:04 AM |
Project Title | Building 907 and 908 Renovation |
Physical Address | View project details and contacts |
City, State (County) | Pineville, LA 71360 (Rapides County) |
Category(s) | Government/Public |
Sub-Category(s) | Military Facility |
Contracting Method | Competitive Bids |
Project Status | Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $100,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | ANY PERSON REQUIRING SPECIAL ACCOMMODATIONS SHALL NOTIFY CORY GUILLOT OF THE TYPE(S) OF ACCOMMODATION REQUIRED NOT LESS THAN SEVEN (7) DAYS BEFORE THE BID OPENING. Questions about this procedure shall be directed to the Designer at Fontenot & Associates, LLC., 2025 N. Jackson St., Alexandria, Louisiana 71301. Phone (318) 427-7808. Attention: Steve Fontenot, Project Engineer. E-Mail Address: steve@sfp-cenla.com. Prospective bidders must attend the entire mandatory Pre-Bid conference in order to submit a bid. The Military Department and Camp Beauregard point of contact is Cory Guillot, Email: cory.j.guillot.nfg@army.mil LMD, 420 F St., Building 420 F St., Camp Beauregard, Pineville, LA 71360 (318) 321-8054. BIDS SHALL BE ACCEPTED ONLY FROM CONTRACTORS THAT ATTEND THE ENTIRE MANDATORY PRE-BID CONFERENCE. ANY PERSON REQUIRING SPECIAL ACCOMMODATIONS SHALL NOTIFY CORY GUILLOT OF THE TYPE(S) OF ACCOMMODATION REQUIRED NOT LESS THAN FIVE (5) DAYS BEFORE THE MANDATORY PRE-BID CONFERENCE. Bids shall be accepted from Contractors who are licensed under LA. R.S. 37:2150-2192 for the classification of BUILDING CONSTRUCTION. Bidder is required to comply with provisions and requirements of LA R.S. 38:2212(B)(5). The successful Bidder will be required to furnish a Performance and Payment Bond written by a company licensed to do business in the State of Louisiana, equal to 100% of the Contract amount, including Additional Bid Items (ABI), if required. No Bid may be withdrawn for a period of forty-five (45) days after receipt of Bids except under the provisions of LA R.S. 38:2214. The Owner reserves the right to accept or reject any and all Bids for just cause. In accordance with directives and guidance published by Facility Planning and Control, the Louisiana Revised Statutes, the provisions and requirements of those stated in the advertisement for bids and those required on the bid form shall not be waivered. The Louisiana Military Department Deputy Director for Contracting and Purchasing and the State Contracting Officer do not possess authority to waive any informality incidental thereto. The Owner shall incur no obligation to the Contractor until the Contract between Owner and Contractor is fully executed. The Louisiana Military Department is a participant in the Louisiana Initiative for Small Entrepreneurships (SE) Program (the Hudson Initiative) and the Veteran-Owned and Service-Connected Disabled Veteran-Owned Small Entrepreneurships Program (the Veteran Initiative). Bidders are encouraged to consider participation. |
||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |