Similar Projects
Worthington Model 8Fl-16 Pump Replacement or Equal
Alteration
Bidding
NJ

Pump Repair and Replacement and Rehabilitation
Infrastructure
Bidding
Vineland, NJ

Well 11 Improvements
Post-Bid
Livingston, NJ

Well Drilling and Installation Services - Replacement Production Well 21-R
Post-Bid
Parsippany, NJ 07054

Electrical and Mechanical Maintenance, Servicing and Repair of Potable Water Wells, Pumping and Related Facilities
Results
Cedar Knolls, NJ 07927

J Street Well House Upgrades
Results
Seaside Park, NJ 08752

DDTH Pumping Station Project
Construction
Kearny, NJ 07032

Well No. 7 Building
New Construction, Infrastructure
Construction
$2,000,000 est. value
Evesham, NJ

Groundwater Containment Treatment System - Sump Pumps
Term Contract
Pending Verification
Boonton, NJ

Pilot Boring/Monitoring Well Construction and Water Quality Sampling
Post-Bid
East Windsor, NJ 08520

2020 Redevelopment of Well No. 10
Results
Margate City, NJ 08402

Water and Sewage Pump Maintenance and Repairs
Post-Bid
Wayne, NJ 07470

Furnish Various Spare Parts for Worthington Pumps
Results
Bayville, NJ 08721

Poplar Avenue Sewage Pump Station Rehabilitation
Renovation
Post-Bid
Linwood, NJ 08221

Sewer Pump Rentals
Results
$95 est. value
Edison, NJ 08817

Last Updated 03/16/2022 01:53 PM
Project Title

Irrigation Well Installation Project at Field of Dreams

Physical Address View project details and contacts
City, State (County) Delanco, NJ   (Burlington County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally includes: The installation of a new 8” diameter irrigation well, submersible pump, 3” schedule 40 P.V.C. pipe to an existing irrigation system, a backflow prevention device, and other miscellaneous piping devices & meters.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents