Similar Projects
Heartland and Cattle Rural Residential Subdivision
New Construction
Conception
Oklahoma City, OK

Scissortail Crossing Phase 1
New Construction
Conception
Oklahoma City, OK 73099

Twin Lakes Estates
New Construction
Design
Noble, OK 73068

Spitler Lake Estates Section 3
Design
Mustang, OK

Purchase and Redevelopment of an Approximately 1.9-Acre Tract of Land
New Construction
Bidding
Oklahoma City, OK 73195

3 Single Family Rental Units
New Construction
Post-Bid
Wewoka, OK

4 Bedroom Unit
New Construction
Post-Bid
Newalla, OK

Gabe's Crossing
New Construction
Construction
Mustang, OK 73064

The Vale at Redbud - Phase II
New Construction
Pending Verification
Catoosa, OK 74015

Red Sky Ranch
New Construction
Pending Verification
Norman, OK 73072

The Woods I - Residential Subdivision
New Construction
Conception
Coweta, OK 74429

Edgewater Phase 3
New Construction
Design
Moore, OK 73160

200 North Yukon Parkway
New Construction, Infrastructure
Pending Verification
Yukon, OK 73099

Huntington
New Construction
Conception
Choctaw, OK 73020

Tuscany Lakes Phase 2
New Construction
Design
Oklahoma City, OK 73100

Last Updated 08/12/2021 01:11 PM
Project Title

The Lakes At Rabbit Run - Phase 2

Physical Address View project details and contacts
City, State (County) Broken Arrow, OK 74011   (Tulsa County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Owner to Subcontract.
Project Status Design Development, Construction Start Expected first quarter 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

71 Single-Family Homes, New Construction, 28.13 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents