Similar Projects
Replace Superstructure
Demolition, New Construction, Infrastructure
Design
$936,836 CJ est. value
Hamilton, IN 46742

Replace Superstructure
Demolition, New Construction, Infrastructure
Design
$936,836 CJ est. value
Hamilton, IN 46742

Angola High School Locker Rooms and Tennis Improvements
Renovation, Infrastructure
Bidding
$1,920,000 CJ est. value
Angola, IN 46703

Bus Depot Addition
Addition, Demolition, Renovation, Infrastructure - 2,700 SF
Sub-Bidding
$750,000 CJ est. value
Angola, IN 46703

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

I-70 Design-Build Added Travel Lanes and Pavement Replacement from SR-1 to IN/OH State Line
Infrastructure
Results

Asphalt Resurface
Infrastructure
Results
IN

Small Structure Replacement - SR 427
Infrastructure
Design
$4,703,511 CJ est. value
Hamilton, IN 46742

2022 Street Improvements
Infrastructure
Post-Bid
Ashley, IN 46705

Community Crossing Project
Infrastructure
Results
Angola, IN

2022 Street Improvements
Infrastructure
Post-Bid
Fremont, IN 46737

Sewer Extension to Town Barn
Alteration
Results
Hamilton, IN

Comfort Station at Pokagon State Park
New Construction, Infrastructure
Post-Bid
$300,000 CJ est. value
Fremont, IN 46737

NORTHEAST DISTRICT (NED) PHASE II WASTEWATER COLLECTION SYSTEM CONTRACT A: PUMP STATIONS NO. 1, NO. 2, AND NO. 9 IMPROVEMENTS
Infrastructure
Results
$3,790,495 CJ est. value
Angola, IN 46703

Last Updated 03/23/2023 09:17 AM
Project Title

NorthEast District (NED) Phase II Wastewater Collection System Contract B

Physical Address View project details and contacts
City, State (County) Angola, IN 46703   (Steuben County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $8,739,227 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

**As of March 23, 2023, project has not been awarded yet, timeframe will be in April.   Contract B - West Service Area A pressure sewer system to serve the Northeast District (NED) Phase II West Service Area, including: 45,000 LFT of pressure sewers and service laterals varying in size between 1-1/4" and 10" 170 EA grinder pump stations 25 EA Flushing/ARV/Hybrid Stations Construction of one (1) new sanitary pump station Replacement of two (2) existing sanitary pump stations Decommissioning of one (1) existing septic absorption field Pavement and landscaping restoration Traffic maintenance Neither the Owner nor its Engineer will be responsible for partial sets of documents obtained from any source. If Bidders fail to register and do not receive updated information, their bids shall be deemed unresponsive if any required items are not included. Instructions to Bidders. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. The Owner reserves the right to reject any proposal for being unresponsive or deemed irresponsible, reject all proposals, or to accept the lowest responsive and responsible proposal/Bidder. Any proposal may be withdrawn prior to the above scheduled time for the opening of proposals or authorized postponement thereof. Any proposal received after the time and date specified shall not be considered. No proposal may be withdrawn after the scheduled closing time for receipt of Bids for at least one hundred fifty (150) days while final project approvals are acquired from the IFA SRF. Wage Rates Wage rates on the project shall not be less than the Federal Davis-Bacon wage scale published by the U.S. Department of Labor. The most recently issued wage scale determination published prior to the date of Bid opening shall be the final applicable wage determination for the Project. American Iron and Steel Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents