Similar Projects
Repair Riser Manifold in Aircraft Maintenance Hangar B141
Renovation
Bidding
$25,000 to $100,000 est. value
Enid, OK

Airport Hangars
New Construction
Post-Bid
Lindsay, OK 73052

Air EVAC Hangar
New Construction
Post-Bid
Ardmore, OK 73401

Seminole Municipal Airport - Construct T-Hangar 20045
New Construction
Results
Seminole, OK 74868

Claremore Regional Airport - New T-Hangar
New Construction
Results
Claremore, OK 74019

Airport Hanger T1 Through T4 Bird Control
New Construction
Post-Bid
Norman, OK 73069

Taxiway and Hangar Project
New Construction, Infrastructure
Results
$1,000,000 to $1,200,000 est. value
Pauls Valley, OK 73075

Bay Depot Maintenance Hangar Tinker AFB, OK
Renovation
Post-Bid
$100,000,000 to $150,000,000 est. value

Hangar Project
Renovation
Post-Bid
$1,000,000 est. value
Pauls Valley, OK 73075

Fy25 Kc-46A 1-Bay Corrosion Control Hangar
New Construction
Post-Bid
$100,000,000 to $250,000,000 est. value
Oklahoma City, OK 73145

Construct Hangars
New Construction
Post-Bid
$300,000 est. value
Thomas, OK 73669

Reported 06/12/2022 11:32 PM
Project Title

KC-46A 2-Bay Depot Maintenance Hangar

Physical Address View project details and contacts
City, State (County) Oklahoma City, OK   (Oklahoma County)
Category(s) Transportation
Sub-Category(s) Aircraft Hangar
Contracting Method Competitive Bids.
Project Status Pre-Solicitation, Construction Start Expected June 2023
Bids Due View project details and contacts
Estimated Value $100,000,000 to $250,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Government project consists of construction of a high bay depot maintenance hangar for the KC-46A Pegasus Aerial Refueling Aircraft. The facility consists of two hangar docks sized to enclose the KC-46A aircraft with required clearances. Within the facility, there is an area that houses the metal shop, kitting area, tool room, break room, and administrative offices. Additionally, there are utility rooms, communications rooms and other support spaces located within the hangar. Includes clearing and grading site, storm drainage, aircraft parking and movement area, utility infrastructure systems, electrical, water, sewer, communications, and all other supporting facilities. Overhead cranes and fall protection will be integrated into this facility. The exterior facility envelope will be metal panels on girts with brick wainscot and large sliding hangar doors.

Details

Aircraft Hangar, New Construction.
Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Rigid Paving, Concrete Paving, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents