Similar Projects
2022 Mechanical Upgrades
Alteration
Bidding
$429,000 est. value
Oglesby, IL 61348

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

HVAC and Mechanical Products
Term Contract
Post-Bid

2021 Life Safety Implementation
Results
Kangley, Streator, IL 61364

Replace Original Generator, Chiller and Mechanical Systems
Renovation
Results
Less than $100,000 est. value
La Salle, IL 61301

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Replace Original Generator, Chiller and Mechanical Systems
Renovation
Results
Less than $1,000,000 est. value
La Salle, IL 61301

Weatherization (IHWAP) Program
Term Contract
Post-Bid

2021 - Building Improvements
Renovation
Results
Grand Ridge, IL

2022 Mechanical Systems Improvements - Pre-Purchase
Alteration
Post-Bid
Ottawa, IL 61350

PAV HA 6th Floor Lab - RO System Upgrade BP-02 (GC)
Alteration
Results
Lexington, KY 40506

2022 HVAC Improvements - 1935 Gym
Alteration
Post-Bid
Marseilles, IL 61341

HVAC Upgrades at Centennial Elementary School
Alteration
Results
Streator, IL 61364

Performance Contracting Basis for Multiple Projects
Alteration
Post-Bid
Mendota, IL

2022 H/LS Renovation Projects
Renovation, Infrastructure
Results
IL

Last Updated 05/12/2022 02:17 PM
Project Title

Seneca High School Cooling Upgrades 2022

Physical Address View project details and contacts
City, State (County) Seneca, IL 61360   (La Salle County)
Category(s) Education, Industrial/Manufacturing, Single Trades
Sub-Category(s) Heating/Cooling Plant, HVAC, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes: The replacement of the existing 1998 central cooling plant (chiller, pumps, piping, etc.). A. Work under this Contract includes: 1. Building Enclosure a. Roofing patching at the area of the new chiller installation b. Demolition of existing support rails and installation of new rails c. Form new openings in existing roof deck d. Reinforcing of existing structure 2. Mechanical Systems a. Replacement of 1998 central cooling plant b. Replacement of pumps and re-working of piping as required for installation of cooling system c. Connection of new equipment to existing BAS system 3. Electrical Systems a. Wiring for new chiller and support equipment 4. Keep Architect fully informed about progress of the work, performance of the work and potential problems.

Details

Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents