Similar Projects
New Hope Academy Expansion
Build-Out - 9,600 SF
Design
Arlington Heights, IL 60004

CPS Falconer ES MEP
Renovation
Bidding
Chicago, IL 60641

2022 Summer Work
Renovation
Bidding
Wheeling, IL

Electrical Fittings, Condut and Electrical Supplies
Post-Bid
Less than $2,003,467 est. value
Chicago, IL

Backup Generator and Automatic Transfer Switch (ATS) Maintenance
Term Contract
Post-Bid
Highland Park, IL

Gym 1 Renovations and Think Lab at Lane Tech HS
Renovation
Results
Chicago, IL 60618

Cloverdale ES New Innovative Center
Renovation
Results
Carol Stream, IL 60188

Worth Elementary
Renovation, Addition
Construction
Worth, IL 60482

Maintenance Shed
Renovation
Bidding
Toulon, IL

2021 Pavement and Playground Renovations
Renovation
Post-Bid
McHenry, IL 60050

Health Life Safety Renovation
Renovation
Results
Dongola, IL 62926

2022 and 2023 Referendum Work - Remodeling at Multiple Sites - Intermediates Attea
Renovation, Infrastructure
Bidding
Glenview, IL

Centennial High School Existing Gym
Renovation
Post-Bid
Champaign, IL 61821

Interior and Stairway Renovations
Renovation
Results
Less than $400,000 est. value
Chicago, IL 60653

Site Improvements - 2022
Renovation
Bidding
Effingham, IL 62401

Reported 02/16/2022 12:00 AM
Project Title

Electrical Work for HVAC Upgrades at Three Facilities - Bid Package #2

Physical Address View project details and contacts
City, State (County) Harrisburg, IL 62946   (Saline County)
Category(s) Education, Single Trades
Sub-Category(s) Electric, Elementary School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Work under Base Bid to include the removal and replacement of the existing electrical connections to HVAC equipment with new electrical connections to new HVAC Equipment at the Elementary and Intermediate Schools. Electrical work associated with disconnecting and abandoning boiler at Davenport Gymnasium and replacing with new rooftop packaged Heating and Air Conditioning Units. New control wiring for BAS at all three locations.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents