Similar Projects
Olive Crossing Mixed Use Development
New Construction - 253,133 SF
Conception
$10,000,000 CJ est. value
Olivette, MO 63132

Hampton Manor of O'Fallon Assisted Living
New Construction - 71,291 SF
Conception
$14,000,000 est. value
O'Fallon, MO 63366

Dutch Brothers Coffee
New Construction, Demolition - 950 SF
Design
$1,200,000 est. value
Belton, MO 64012

Windstar Bussing
New Construction - 9,152 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Kansas City, MO 64129

Highway 58 Waterline Replacement
Infrastructure
Bidding
$108,451 CJ est. value
Raymore, MO 64083

Geothermal Wellfield #4
Infrastructure
Bidding
$2,215,000 CJ est. value
Rolla, MO 65401

Power Plant Demolition
Demolition, Infrastructure
Sub-Bidding
$140,000 CJ est. value
Rolla, MO 65401

Demolition of a Structure
Demolition, Infrastructure
Sub-Bidding
$40,000 CJ est. value
Battlefield, MO 65619

Preservation Square Phase 2B - Site Prep Package
Infrastructure
Post-Bid
Saint Louis, MO 63106

Badenhaus Apartments Site Improvements
Infrastructure
Post-Bid
Saint Louis, MO 63147

Sitework Services
Term Contract
Results
Columbia, MO

Harrison County Bridge 6870010-1 East Fork Big Creek
New Construction, Infrastructure
Results
$600,000 to $850,000 est. value
Bethany, MO 64424

Tin Roof Bar
New Construction
Construction
Kansas City, MO 64111

Kaldi's Coffee Shop
New Construction - 1,155 SF
Construction
Less than $500,000 CJ est. value
Saint Charles, MO 63303

AC Rialto by Marriott
Renovation - 169,000 SF
Pending Verification
$65,700,000 est. value
Kansas City, MO 64106

Last Updated 07/29/2022 12:39 AM
Project Title

Murphy Oil #6894/7830 / Potosi

Physical Address View project details and contacts
City, State (County) Potosi, MO 63664   (Washington County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Gas Station, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction start expected March 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the demolition of an existing structure and the construction of a gas station/convenience store. As of 3-2-2022, a general contractor has been awarded. Construction is anticipated to commence 3-7-2022.

Details

1 Story Above Grade, 1,400 SF.
Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Panel Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities, Liquid Fuel Distribution, Gasoline Distribution, Gasoline Piping, Gasoline Pumps, Diesel Fuel Distribution, Diesel Fuel Piping, Diesel Fuel Pumps, Fuel-Storage Tanks, Underground Fuel-Storage Tanks.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents